Section - IVA: The Designer,
Stress Problems and Stress Training
By:
James O. Pennock
Stress related technical and execution problems in the design of process plant piping are complex and must be addressed properly. There will be some Piping Designers, Stress Engineers and others who read this and say that they agree. Others may say that they do not agree. Others will just not know one way or the other. This discussion, while not covering solutions to every potential problem, is intended only to highlight some of the most common stress related factors and designer training needs There
are five basic factors that influence piping and therefore piping
stress in the process plant. There is temperature, pressure, weight,
force and vibration. These factors will come in many forms and at
different times. Stress problems become all the more complex because
two or more of these will exist at the same time in the same piping
system. The main objective
of the focus when dealing with problems related to piping systems
is not normally the pipe itself.
In a very high percentage of the time it is not the pipe
that is the weakest link. Note this: the pipe is normally stronger
and/or less vulnerable to damage than what the pipe is connected
to. Pumps are just one examples of equipment to
which pipes are routinely connected.
Misalignment problems caused by expansion (or contraction)
in a poorly designed system can result in major equipment failure.
Equipment failures can lead to the potential for fire, plant shutdown
and loss of revenue. At this point it should be emphasized that
the success (or failure) of the plant’s operation, years down the
road can and will depend on what is done up front by all
the members of the design team during the design stage.
An important point to remember, “While analysis cannot create
a good design, it can confirm a good design” (Improved Pump Load
Evaluation,” Hydrocarbon Processing, April 1998, By: David W. Diehl,
COADE Engineering Software, Inc Houston, TX).
On the other hand, proper analysis will identify bad design
and potential problems in a piping system design. Stress Related
Design Factors
Temperatures in piping systems may range
from well over 1000o F (537.8 C) on the high side to
below -200 o F (-128.8 C) on the low side. Each extreme on the temperature scale and everything in between
brings its own problems. There
will also be times when both high and low temperatures can occur
in the same piping system. An
example of this would be in piping that is installed in an arctic
environment. The piping is installed outdoors where it is subjected to -100
o F (-73.3 C) over the arctic winter.
Six to nine months later it is finally commissioned started
up and may operate at five or six hundred degrees.
The
problems that temperature causes is expansion (or contraction) in
the piping system. Expansion or contraction in a piping system is
an absolute. No matter what the designer or the stress engineer
does they cannot prevent the action caused by heat or cold. Expansion or contraction in a piping system
it self is not so much a problem.
As we all know if a bare pipe was just lying on the ground
in the middle of a dry barren desert it will absorb a lot of heat
from just solar radiation. In the hot sun piece of pipe can reached 150
o F (65.5 C). The
pipe will expand and with both ends loose it would not be a problem.
However, when you connect the pipe to something,
even if only one end is connected you may begin to have expansion
related problems. When the
pipe is anchored or connected to something at both ends you absolutely
will have expansion induced problems.
Expansion induced problems in a piping system is stress.
There are a number of ways to handle expansion in piping systems.
Flexible routing is the first and by far the cheapest and
safest method for handling expansion in piping systems.
The other way is the use of higher cost and less reliable
flexible elements such as expansion joints.
Stress will exist in every piping
system. If not identified
and the proper action taken, stress will cause failure to equipment
or elements in the piping system itself.
Stress results in forces at equipment nozzles and at anchor
pipe supports. Two piping configurations with the same pipe
size, shape, dimensions, temperature and material but with different
wall schedules (sch. 40 vs. sch. 160) will not generate the same
stress. Force in piping systems is not
independent of the other factors.
Primarily, force (as related to piping systems) is the result
of expansion (temperature) and/or pressure acting on a piping configuration
that is too stiff. This
may cause the failure of a pipe support system or it may cause the
damage or failure of a piece of equipment.
Force, and the expansion that causes it, is best handled
by a more flexible routing of the piping. Some people suggest that force can be reduced
by the use of expansion joints.
However we must remember that for an expansion joint to work
there must be an opposite and equal force at both ends to make the
element work. This tends to compound the problem rather than
lessen it. Pressure in piping systems also
range from the very high to the very low.
Piping systems with pressure as high as 35,000 psi in some
plants are not unusual. On
the other hand piping systems with pressures approaching full vacuum
are also not unusual. The pressure (or lack of) in a piping system
effects the wall thickness of the pipe.
When you increase the wall thickness of the pipe you do two
things. First, you increase the weight of the pipe. Second, you increase the stiffness of the pipe
thus the stress intensification affecting forces. Increasing the wall thickness of the pipe is
the primary method of compensating for increases in pressure. Other ways, depending on many factors include
changing to a different material.
With low or vacuum systems there are also other ways to prevent
the collapse of the pipe wall.
Among these the primary method is the addition of stiffening
rings. Stiffing rings may be added internally or externally
depending on the commodity type and the conditions. Weight in a piping system is expressed normally as dead load. The weight of a piping system at any given point is made up of many elements. These include the weight of the pipe, the fittings, the valves, any attachments, and the insulation. There is also the test media (e. g. hydrotest water) or the process commodity whichever has the greater specific gravity. Piping systems are heavy, period. Everybody involved in the project needs to understand this and be aware that this weight exists and it needs to be supported. Ninety-nine times out of a hundred this weight will be supported from a structural pipe support (primary pipe support system) of some kind. However there are times when the piping (weight) is supported from a vessel or other type of equipment. Vibrations will also occur in piping
systems and come in two types.
There is the basic mechanical vibration caused by the machines
that the piping is connected to.
Then, there is acoustic (or harmonic) vibration caused by
the characteristics of the system itself.
Typically the only place severe vibrations will be found
is in piping connected to equipment such as positive displacement
reciprocating pumps or high pressure multi-stage reciprocating compressors
and where there is very high velocity gas flows.
All
of the issues listed above that a piping system is exposed to need
to be covered in a company specific or company sponsored piping
designer, stress-related training program. This piping designer,
stress-related training should be done at the department level,
early in the designer’s career and prior to the start of the project.
Unfortunately however this is not always the case.
By
definition, the role of the piping designer is to design the plant
piping systems. This means design all of the system.
Design all of the system means that the piping designer shall
define the proper routing of each and every pipeline required for
the project. This includes
each and every inline component (pipe, valves, fittings, flanges,
instruments, etc.), every online component (anchors, guides, hangers,
etc.). It includes the definition
of any attached piece of equipment and the definition of every support
point. To do this and do it properly the designer must know about
piping stress issues and know what to do about them. The designer
is responsible for a lot and so they need to know a lot.
Is
there any risk involved to the company or the project in not doing
this stress related designer training?
Yes! First, a designer who is naïve about the cause
and effect of stress related problems would not be able to recognize
the symptoms and will burn a lot of budget hours and create bad
designs. Second, bad designs are subject to the ‘domino
effect’ when the need for corrective action is finally identified
and taken then other lines get “pushed” and then modifications to
them are required. Third,
when the bad design does get to the stress engineer for analysis
there is the potential for repeated recycle and a serious delay
in the design issue schedule.
Designer Stress
Training
What
does the piping designer need to know?
Piping design is more than just knowing how to turn on the
computer, how to find the piping menus and the difference between
paper space and model space. So, appropriately, what else does the
designer need to know about piping design besides how to connect
a piece of pipe to a fitting?
Here
is a list of some of the most basic of things that a good piping
designer should know. Thinking about every one of these items should
be as natural as breathing for a good piping designer.
·
Allowable pipe spans – All designer need to know and understand the span
capabilities of pipe in the different schedules for a wide variety
of common piping materials. When
a new project introduces a new material with severely reduced span
capabilities; supplemental training may be required.
·
Expansion of pipe – All designers must understand that they need to treat
a piping system as though it is alive.
It has a temperature and that temperature causes it to grow
and move. That growth and movement must be allowed for
and incorporated in the overall design. Not just of that specific
line but for all other lines close by.
The process of expansion in a pipe or group of pipes will
also exert frictional forces or anchor forces on the pipe supports
they come in contact with.
·
Routing for flexibility – The piping designer must understand how to route
pipe for flexibility. Routing
for flexibility can normally be achieved in the most natural routing
of the pipeline from its origin to its terminus.
Routing for flexibility means (a) do not run a pipe in a
straight line from origin to terminus and (b) building flexibility
into the pipe routing is far cheaper and more reliable than expansion
joints.
·
Weight and loads (live loads and dead loads) – The piping designer needs
to understand the effects of weight and loading. They need to know and understand that everything has a weight. They need to be able recognize when there is
going to be a concentrated load.
They need to have access to basic weight tables for all the
standard pipe schedules, pipe fittings, flanges, valves for steel
pipe. They also need to
have the weight tables for other materials or a table of correction
factors for these other materials vs. carbon steel. They need to be able to recognize when downward
expansion in a piping system is present and is adding live loads
to a support or equipment nozzle.
·
Equipment piping – The piping designer needs to know the right and the
wrong way to pipe up (connect pipe to) different kinds of equipment. This includes pumps, compressors, exchangers,
filters or any special equipment to be used on a specific project.
·
Vessel piping – The piping designer also needs to understand about the
connecting, supporting and guiding of piping attached to vessels
(horizontal or vertical) and tanks.
They need to know that nozzle loading is important and does
have limitations.
·
Rack piping – The designer needs to understand that there is a logical
approach to the placement of piping in (or on) a pipe rack. It does not matter how wide or how high the
rack or what kind of plant, the logic still applies. Starting from one or both outside edges the largest and hottest
lines are sequenced in such a manner that allows for the nesting
of any required expansion loops.
The spacing of the lines must also allow for the bowing effect
at the loops caused by the expansion.
·
Expansion loops – The designer needs to understand and be able to use simple
rules and methods for sizing loops in rack piping. This should include the most common sizes,
schedules and materials.
·
Cold spring/Pre-spring – Designers should understand the basics rules of
cold spring and pre-spring. They
need to understand what each one is along with when to and when
not to use each. Piping Designer
or Piping Drafter
Any piping designer that has this type of training, this type of knowledge and then consistently applies is indeed a piping designer. He or she will also be a more valuable asset to their company and to themselves in the market place. On the other hand anyone who does not know or does not apply the knowledge about these issues while doing piping work is nothing more than a piping drafter or a CAD operator.
James O. Pennock is a former Piper with more than 45 years experience covering process plant engineering, design, training, pipe fabrication and construction. He is now retired and lives in Florida, USA.
|