8 years 4 months ago #9050 by RVS
Dear all,
I am in pulb and paper and power industry side. Please explain the piping consideration of Pipe layout the following systems
1. Feed water systems
2.main steam line system
3.sootblower system
4.waste water system
5.air system (like burner,air port, cooling air)
6.air preheater system
7. cooling water system
8.ejector system
please I am a freshers in piping. but some of the project handled ownly. so pls give some ideas to me, for best of my job

Please Log in or Create an account to join the conversation.

More
8 years 4 months ago #9053 by Anton
Replied by Anton on topic required details of Piping layout system
RSV,

That is a very big list, and would require either a lengthy training course or a lot of time spent under the guidance of a senior piping designer.

I doubt if anyone here will have the time or energy to reply with anything useful to such a general request.

- If you're the smartest person in the room ... you're in the wrong room.

Please Log in or Create an account to join the conversation.

More
8 years 4 months ago #9054 by Jop
RVS,
I would really like to help you but I need more information.
1. Where are you?
2. Where is this Project?
3. What kind of project is this: Power or Pulp?
4. Is this an Outdoor Plant or an indoor Plant?
5. Do you have a Plot Plan for This Project?
6. Is this a New Project or is this a Revamp Project?

Do it once and Do it Right

Please Log in or Create an account to join the conversation.

More
8 years 4 months ago #9055 by RVS
dear Mr, Jop
thanks for ur helping mind, I am from india, project based on finland, This is power project, indoor project
I haven't plot plan yet. This is a new project. please help the mentioned systems layout consideration for me.

Please Log in or Create an account to join the conversation.

More
8 years 4 months ago #9056 by Jop
My email address is - This email address is being protected from spambots. You need JavaScript enabled to view it. please use it for more communications.

You cannot even start to think about system routing until you have the following items in hand.
- A copy of the Plot plan showing the location of all the equipment involved with each system.
- A copy of all the P&ID's involved for each system.
- A clear understanding of the planned Pipe Support method (floor supported or traipse support from the rafters) , location and elevations.

Do it once and Do it Right

Please Log in or Create an account to join the conversation.

More
8 years 4 months ago #9057 by RVS
dear Mr. Jop

Thanks for your valuable reply. I noted your email ID. In any query I will rise a mail to u. once again thank u very much