Thumb rules to prepare Equipment Layout

More
11 years 11 months ago - 11 years 11 months ago #6369 by Peter Pyper
Replied by Peter Pyper on topic Re: Thumb rules to prepare Equipment Layout
Don't pocket the kicker line at the pig trap.
Make sure there is enough barrel length for the pig including smart pigs.
Set closure end at vehicle height so that pig can be lifted on to a truck.
May need crane access.
Good turn around area for largest vehicle.
Full Port valves.
Don't forget barred Tees.
Enough flexibility for Stress esp. if it is a large pipeline.

Please Log in or Create an account to join the conversation.

  • rlpooniya
  • rlpooniya's Avatar Topic Author
  • Offline
  • Junior Member
  • Junior Member
More
11 years 11 months ago - 11 years 11 months ago #6419 by rlpooniya
Replied by rlpooniya on topic Re: Thumb rules to prepare Equipment Layout

Don't pocket the kicker line at the pig trap.
Make sure there is enough barrel length for the pig including smart pigs.
Set closure end at vehicle height so that pig can be lifted on to a truck.
May need crane access.
Good turn around area for largest vehicle.
Full Port valves.
Don't forget barred Tees.
Enough flexibility for Stress esp. if it is a large pipeline.



Thanks Mr.Peter Pyper,

May I know what are the guidelines to place (or locate) underground Condensate collection Tank & Water Bath Heater in Equipment Layout (In that layout, other equipments are - PL/R, KOD, Filter Separators, Pressure Regulating Skid & Metering Skids for 30" Natural Gas Line).