TOPIC: LIQUID FLOW VERTICAL DOWN -ORIFICE INSTALLATION

6 years 6 months ago #8286

  • SHIPRA
  • SHIPRA's Avatar
  • Offline
  • New Member
  • Posts: 2
  • Karma: 0
We have a case where we need to install orifice flange for liquid (water service ) in vertical line
with liquid flow vertically downwards. Is it acceptable practice? Have any one of you have done this?
Rgds
Shipra

Re: LIQUID FLOW VERTICAL DOWN -ORIFICE INSTALLATION 6 years 6 months ago #6781

  • Jop
  • Jop's Avatar
  • Offline
  • Moderator
  • Posts: 1052
  • Thank you received: 14
  • Karma: 11
It has been a very long time but I remember having:
1 - Vertical Orifice run
2 - Flow up
3 - Vapor/Gas
4 - Only with review and approval of both the Process Engineer and the Instrument Engineer
Do it once and Do it Right

Re: LIQUID FLOW VERTICAL DOWN -ORIFICE INSTALLATION 6 years 5 months ago #6782

  • SHIPRA
  • SHIPRA's Avatar
  • Offline
  • New Member
  • Posts: 2
  • Karma: 0
It has been a very long time but I remember having]


Thanks for feed back.