LIQUID FLOW VERTICAL DOWN -ORIFICE INSTALLATION

  • SHIPRA
  • SHIPRA's Avatar Topic Author
  • Offline
  • New Member
  • New Member
More
11 years 1 month ago - 11 years 1 month ago #8286 by SHIPRA
We have a case where we need to install orifice flange for liquid (water service ) in vertical line
with liquid flow vertically downwards. Is it acceptable practice? Have any one of you have done this?
Rgds
Shipra

Please Log in or Create an account to join the conversation.

More
11 years 1 month ago - 11 years 1 month ago #6781 by Jop
It has been a very long time but I remember having:
1 - Vertical Orifice run
2 - Flow up
3 - Vapor/Gas
4 - Only with review and approval of both the Process Engineer and the Instrument Engineer

Do it once and Do it Right

Please Log in or Create an account to join the conversation.

  • SHIPRA
  • SHIPRA's Avatar Topic Author
  • Offline
  • New Member
  • New Member
More
11 years 1 month ago - 11 years 1 month ago #6782 by SHIPRA

It has been a very long time but I remember having]


Thanks for feed back.

Please Log in or Create an account to join the conversation.

Moderators: Jop
Time to create page: 0.191 seconds