piping designers . com | Forum
pipingdesigners.com home page pipingdesigners.com home page Get the RSS Feed from the Forum pipingdesigners.com on Facebook pipingdesigners.com on twitter pipingdesigners.com on LinkedIn About pipingdesigners.com pipingdesigners.com Forum pipingdesigners.com Codes & Standards pipingdesigners.com Links pipingdesigners.com Tools pipingdesigners.com Tips pipingdesigners.com Training pipingdesigners.com Jobs Board pipingdesigners.com home page

Like Us on Facebook Piping Designers LI Group follow pipingdesigners.com on twitter piping designers . com About Us piping designers . com Forum piping designers . com Codes & Standards piping designers . com Links piping designers . com Tools piping designers . com Training Piping Jobs Board piping designers . com piping designers . com

The Piping Designers Job Board

It is currently Fri May 24, 2013 6:13 am

All times are UTC [ DST ]




Post new topic Reply to topic  [ 5 posts ] 
Author Message
 Post subject: Pipe support base plate requirement
Unread postPosted: Tue Nov 08, 2011 10:18 pm 
Offline

Joined: Tue Nov 08, 2011 9:47 pm
Posts: 2
Years of Experience: 9
Country: United Arab Emirates
Hi all,

I am working on pipe stress analysis for offshore platforms and FPSO projects.
In onshore, the pipe supports (L post / T post) are directly welded to structure. But in offshore the support specification strictly asks to weld a base plate above deck plate and then weld support steel on this base plate. It is only when we take support above platform decks.
For supports taken below platform deck (i.e, inverted L post or inverted T post and Goal post types), it is directly welded below structural beam.
I don't understand this requirement. One thing I know is if we cut deck plate and weld support stanchion over the structure, the water accumulation in the cut is possible and thus corrosion. But in this case we can weld the stanchion over deck plate without cutting it. so, why we need an additional base plate above deck plate?
Please give your views if anyone has worked on these sort of support detailing.

thanks in advance.
-shankar.


Top
 Profile  
 
 Post subject: Re: Pipe support base plate requirement
Unread postPosted: Fri Nov 11, 2011 9:20 pm 
Offline

Joined: Fri May 26, 2006 7:47 pm
Posts: 845
Location: Florida, USA
Years of Experience: 45
Country: United States of America
I have never worked on the design of either of these two types of projects so, I have a question.
What are the decks of an "Offshore Platforms" and "FPSO" projects made of?

A- "Solid Plate" (which does not drain so good)?
or
B- "Open Grating" (which will drain free real easy)?

I would think that since these types of installations are subject to high waves and the potential heavy rain due to Hurricanes (Cyclones or Typhoons) then "Open Grating" would offer a grater degree of safety (no standing puddles) and reduced corrosion.

_________________
You must want to succeed before you can.


Top
 Profile  
 
 Post subject: Re: Pipe support base plate requirement
Unread postPosted: Thu Nov 17, 2011 6:01 pm 
Offline

Joined: Tue Nov 08, 2011 9:47 pm
Posts: 2
Years of Experience: 9
Country: United Arab Emirates
Hi Jop,

Thanks for your reply.
The decks are made of either beams or pipes above which a deck plate or grating is placed.
we prefer grating for exactly the same reason you mentioned. but in places where handling or any safety measure is required, they provide deck plate of usually 10mm thk. it is placed all over the structural steel or pipe and welded completely.

wherever the grating is provided, we can cut grating and place support directly over the structural steel or structural pipe. But wherever the deck plate is provided over structure, it is not advised to cut.
i can think of cutting the deck plate to a size wider than beam flange. in this way, we create a gap on both side of the beam flange, so it facilitates draining.
but i am not sure if it is acceptable. that's why i am looking forward to some expert's view on this who has done similar jobs before.


Top
 Profile  
 
 Post subject: Re: Pipe support base plate requirement
Unread postPosted: Mon Nov 21, 2011 8:19 am 
Offline

Joined: Sat Jul 30, 2011 10:53 pm
Posts: 5
Years of Experience: 8
Country: India
Though I dint worked in offshore platform Stress jobs, what comes to my mind is that, if u weld a inverted T-post or L-post on deck grating plate the welding will be interminent & weld joint strength would get compromised & if we weld directing on Deck plate then in future if the support is to removed it will leave a metal beeds on deck plate, if deck plate gets grinded it may effect the deck metal plate strength , hence a wear pad like base pad is advised to be used to defeat these problems.
Hope it added some value to the answer.


Top
 Profile  
 
 Post subject: Re: Pipe support base plate requirement
Unread postPosted: Mon Nov 21, 2011 9:30 am 
Offline

Joined: Wed Mar 25, 2009 5:26 pm
Posts: 12
Years of Experience: 12
Country: Ireland
I have no experience of off shore, but I do have experience of supporing off grating/decking.
Grating/decking will have a design load ie. XkN/Msq. So if your support load is 0.5X then your base plate will have to have an area of 0.5Msq to effectively spread the load accross the decking/grating so as to not comprimise the design load of the decking. HTH.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 5 posts ] 

All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Jump to:  
cron  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group