pipingdesigners.com home page pipingdesigners.com home page Get the RSS Feed from the Forum pipingdesigners.com on Facebook pipingdesigners.com on twitter pipingdesigners.com on LinkedIn About pipingdesigners.com pipingdesigners.com Forum pipingdesigners.com Codes & Standards pipingdesigners.com Links pipingdesigners.com Tools pipingdesigners.com Tips pipingdesigners.com Training pipingdesigners.com Jobs Board pipingdesigners.com home page

Like Us on Facebook Piping Designers LI Group follow pipingdesigners.com on twitter piping designers . com About Us piping designers . com Forum piping designers . com Codes & Standards piping designers . com Links piping designers . com Tools piping designers . com Training Piping Jobs Board piping designers . com piping designers . com

The Piping Designers Job Board

It is currently Tue May 21, 2013 9:58 pm

All times are UTC [ DST ]




Post new topic Reply to topic  [ 2 posts ] 
Author Message
 Post subject: Code ANSI-B31.1 AND ANSI-B31.3
Unread postPosted: Mon Jan 05, 2009 8:27 am 
Offline

Joined: Tue Dec 09, 2008 5:22 am
Posts: 1
Hi everyone
Who can explain to me two questions :
1/ Can you explain in detail three or more major differences between code ANSI B31.1 and code ANSI B31.3 ?
2/ There is a power plant inside a Process refinery . Where exactly the ANSI B31.1 & ANSI B31.3 scope break occurs ?

thanks :idea:


Top
 Profile  
 
 Post subject: Re: Code ANSI-B31.1 AND ANSI-B31.3
Unread postPosted: Wed Feb 18, 2009 7:30 am 
Offline

Joined: Sat Feb 14, 2009 12:55 pm
Posts: 13
Years of Experience: 1
Country: India
pipinglove wrote:
Hi everyone
Who can explain to me two questions :
1/ Can you explain in detail three or more major differences between code ANSI B31.1 and code ANSI B31.3 ?
2/ There is a power plant inside a Process refinery . Where exactly the ANSI B31.1 & ANSI B31.3 scope break occurs ?

thanks :idea:

B31.1 - 2001 - Power Piping

Piping for industrial plants and marine applications. This code prescribes minimum requirements for the design, materials, fabrication, erection, test, and inspection of power and auxiliary service piping systems for electric generation stations, industrial institutional plants, central and district heating plants.

The code covers boiler external piping for power boilers and high temperature, high pressure water boilers in which steam or vapor is generated at a pressure of more than 15 PSIG; and high temperature water is generated at pressures exceeding 160 PSIG and/or temperatures exceeding 250 degrees F.

B31.3 - 2002 - Process Piping

Design of chemical and petroleum plants and refineries processing chemicals and hydrocarbons, water and steam. This Code contains rules for piping typically found in petroleum refineries; chemical, pharmaceutical, textile, paper, semiconductor, and cryogenic plants; and related processing plants and terminals.

This Code prescribes requirements for materials and components, design, fabrication, assembly, erection, examination, inspection, and testing of piping. This Code applies to piping for all fluids including: (1) raw, intermediate, and finished chemicals; (2) petroleum products; (3) gas, steam, air and water; (4) fluidized solids; (5) refrigerants; and (6) cryogenic fluids. Also included is piping which interconnects pieces or stages within a packaged equipment assembly.

2nd question ans is in the 1st one itself


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Jump to:  
 
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group