pipers i have one query regarding welding of Pipes.....we maintain the minimum gap between two welds 100 mm ?

5 Posts
3 Users
0 Reactions
57 Views
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter   [#322]

Hi pipers
i have one query regarding welding of Pipes.....we maintain the minimum gap between two welds 100 mm ?
is the only reason behind that is heat affected zone ?
what is the exact problem we face on site if the gap between two welds is less than 100?
can we do the PWHT( Post Weld Heat Treatment ) simultaneously or rather together for the two welds .
PWHT is done exactly after the welding or it is done after some time?
Assume the material to be welded is CS ( ASTM 106B)
Regards
SG



   
Quote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

Only a qualified Welding Engineer/Metallurgist can evaluate the need and/or the effectiveness of "Normalizing" the pipe weld area by post weld heat treatment (PWHT).

He (or she) would possibly require:
- Weld (#1 &#2),
- Cool,
- Perform any required NDE (PT, MT, UT, or RT as required),
- Evaluate the need for PWHT,
- (if yes) do PWHT,
- cool,
- perform NDE (Charpy test) and evaluate



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

I'd like to offer a little different answer, ...WHEN you weld fittings closer then 3" you get the over-lapping heat effected zones which can cause embrittlement of the steel in those areas. Now if this was on a gravity drain piping system there wouldn't be an issue. However if this was on a 1500# steam line then there could be a real issue that can cause a failure of the line. PWHT is normally done in a shop, it's much easier to "cook" the whole spool piece and control temperatures required. However PWHT can be done in the field, it is done with a special electrical blanket that "cooks" the welded area in question and slowly brings it back down to ambient temperature. This is a much more costlier operation, and planning should be utilized to eliminate this requirement, but sometime retro-fitting piping systems there is no way around it. JOP is correct that a welding engineer needs to look over and direct the PWHT operation, it is NOT sometime a normal engineer would or could deal with.



   
ReplyQuote
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter  

@11echo
Do you want to say that PWHT depend on the functionality of Pipe ?
is the PWHT is done immediately after the weld ?
Regards
SG



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

skgarg ...Doing a PWHT is NOT required on every piping system! As I indicated a gravity drain does not encounter much stress so why would you want to use high dollar process on it? ...Kinda like using grade 8 bolts on a farm gate when grade 2 would work!
NO you do not have to do a PWHT just after the weld has been made! In fact it would be better to get all the spool pc.s fabricated and then ship the ones the require the PWHT to the shop at that time. Trying to do each spool after it's fabricated would use up a lot of time and effort and not be real efficient use of it.



   