Hi all
In one of current projects involving a SRU unit, I came across CONTRO TRACING
Can I get some material on it to study (I am not getting good material via googling)
Following topics are my interests :-
1) What are the main tracing types or modes,
2) Why CONTO TRACING ?
3) Comparison b/w various tracing modes, i.e. STEAM TRACING, JACKETING, CONTRO TRACING & ELECTRICAL TRACING.
4) Contro tracing details (some thermodynamic & matullurgical aspects).
Waiting for reply.....!
Please go here:
http://www.csiheat.com/
Controls SouthEast is the company that developed and sells "ControTrace"
how and who decide which type of tracing you will use?
agreed with echo point , if you will use contro tracing the supporting of piping
will hamper a lot .
cheers
skg
Hi all
@jop
I had already visited this website, there are many aspects covered there,
but no broad comparisons are being made b/s Electric tracing, steam tracing,
contro tracing & jacketing(major emphasis being on Contro tracing)
Something more, which can differentiate these things ?
@11echo
This type of tracing is used to save cost over Jacketing in some units like
Sulphur Recovery Unit
It can also be sometimes used over steam tracing as it is more efficient.
And supporting is also adequately done
for details this link might help :
http://www.csiheat.com/Uploads/files/CTInstallation.pdf
aneesh …I can see where this "contro tracing" could be used instead of the annular jacket pipe. It looks to have more surface contact with the pipe so better heat transfer, and with a larger “medium” channel, it would be harder to plug. However your Link only shows how it’s install on the pipe, not how it sitting on supports or how it is insulated. Initially it looks semi-cumbersome to install, components look “expensive”, and I still suspect installing insulation would be an issue. So overall (for me anyway) I don’t see any major advantage of this “contro tracing” over normal ST or HMT tracing. My $0.02 anyway.
[color=#FF0040]11echo,
Your statement in your last post is correct. But, remember the original poster Aneesh asked:[/color]
1.
"In one of current projects involving a SRU unit, I came across CONTRO TRACING
Can I get some material on it to study (I am not getting good material via googling)?"
I only gave him a link to the CSI websit so he could get the information on ContraTrace
Then he stated:
Following topics are my interests :-
1) What are the main tracing types or modes, 11Echo, You have identified the main tracing types
2) Why CONTO TRACING ? Aneesh will need to get all the information and study it
3) Comparison b/w various tracing modes, i.e. STEAM TRACING, JACKETING, CONTRO TRACING & ELECTRICAL TRACING. Aneesh will need to get all the information and study it
4) Contro tracing details (some thermodynamic & matullurgical aspects).Aneesh will need to get all the information and study it
aneesh
@11echo
This type of tracing is used to save cost over Jacketing in some units like
Sulphur Recovery Unit
It can also be sometimes used over steam tracing as it is more efficient.
[b]And supporting is also adequately done
for details this link might help[/b] :
http://www.csiheat.com/Uploads/files/CTInstallation.pdf
JOP ...Not sure if we are talking apples to apples here? I wasn't responding to the link you had posted, I was responding to the link Aneesh had posted in the above quoted post. To be honest (as I had stated) this is/was my first look at this Conto Tracing and although it has some interesting features, IMHO ...I believe it also has afew draw backs. Aneese's link clearly shows how this tracing is installed, but doesn't hint as to insulation or supporting.
Supporting of ControTrace (On pipe)
The ControTrace (CT) is supported by and from the pipe itself. The CT can ind is affixed to the pipe almost any place around the pipe you want or need to place it. It is normally affixed at or near the bottom (6-O-Clock position) of the pipe. This is no problem except at pipe supports. At a support the CT is rotated from the 6-O-clock position to 4-O-Clock or 8-O-Clock to pass the Shoe.
You can also choose to run the CT at an off the bottom position all the way, no big deal.
Insulation of ControTrace:
The insulation of CT is very much the same as for single or double Stream Trace tubing installations. You select insulation for the next larger line size so it fits over the pipe and the added CT or tubing.
Improved Heat Transfer:
"Thermon" Heat Transfer Cement is often used to improve the transfer of heat from the CT, Tubing, Electrical Cable,etc. See: http://www.thermon.com/us/heattransfer.aspx
Alternate Tracing Methods] http://www.thermon.com/catalog/us_pdf_files/tsp0030.pdf [/url]
Jop]Well I knew we weren’t talking apples to apples on some of the issues. I “KNEW” actually Contro Trace was supported off the pipe, however my issue was supporting the PIPE with Contro Trace installed on it. We both know the ideal location to position this tracing is on the bottom or as near to that as possible, BUT positioning this tracing at 6 o-clock obviously that isn’t the best position with Contro Trace installed; the weight of the pipe with commodity “could” even crush the Contro channel. So now the next best place is rotating it to 4 o-clock or 8 o-clock position (as you have indicated). This would allow the pipe to sit directly on the pipe support with or without shoes, BUT additional care would need to be taken so we would not be interfering with the banding used to attach the Contro Trace or the jumper loops between channels. ALSO at this location the jumper loops now present issues with running this pipe in pipeways or supports with more then just one pipe. It would require significantly more clearance between pipes. I won’t even get into grinding ALL seams down that are over 1/8” high, OR the requirement of heat transfer cement on all the channels, OR the way they “maneuver” this channel on 90 Deg. ell.s (did you see all the miter welds! *G*).
I’ll bow to your ideal of getting one size larger insulation, but with all the jumper loops poking out, it’ll require more labor, and it won’t look very pretty! *G*
I still think this is interesting “stuff” and it has possibilities, but there are a number of limitations too …and it still looks “expensive”. …My $0.02!
Fluid flow properties (viscosity, density etc.) are related to temperature. The fluid must be in flowing state inside pipe. It will cause problems if it thickens / solidifies. Thus we come across situations where the temperature has to be other than room temperature. The fluids that require higher temperature are obviously heat traced. The selection, thus, will depend on (not solely),
1. Temperature at which the fluid remains flowing.
2. The quantity of fluid that needs to be maintained in this state.
3. Heat load required to maintain the temperature based on 1 and 2.
So it is clear the fluid itself will be major determinant.
Also I checked out the presentation. CSI have provided good information about the practice.
1. Can the valves be also CONTRO-TRACED? In case of full jacketing lines (SRUs have these!) the valves are also jacketed.
2. The advised location in presentation is sideways. The heating will be by conduction. So along the perimeter of pipe, will there be uneven temperature profile?
3. Additional weight per unit length of pipe.
Do the parameters 2 and 3 need to be considered by the stress engineer?
Perhaps, the vendor will be great help as they have developed the system.
Regards,