PipingDesigners Community

A place for piping designers, engineers and industry professionals to ask questions, share experience, discuss technical topics and connect with other professionals.

Browse the discussions below or start a new topic. Please keep discussions practical, professional and relevant to the piping and engineering community.

This dissertation s...
 
Notifications
Clear all

This dissertation seeks to provide an in-depth study being done on to why there is no substantial cost (man-hour)…

4 Posts
3 Users
0 Reactions
73 Views
(@symonsbindeni-com-zm)
New Member
Joined: 19 years ago
Posts: 1
Topic starter   [#876]

This dissertation seeks to provide an in-depth study being done on to why there is no substantial cost (man-hour) saving per Piping Isometric through the use of automated CAD systems such as PDS, compared with manual generation. Manually generated isometrics take on average between 12 and 14 hours to produce and isometrics generated through automation should take on average, 6 hours.
The isometric composes of tasks, roles, rules, specification, communication, supervision and quality checks. It is born from a P&ID which is regarded as the heart of this deliverable. From the P&ID, material specifications, equipment and instrument datasheets are generated. The process is comprehensive as it includes all elements of engineering and the relationship or interaction between the disciplines at all levels.
It is useful to explain the inter-relationship between the engineering processes that influence the final outcome of this document. Here, the general concepts and principles of plant layout become evident. This involves efficiencies of process flow, the rules and specifications which govern the placement of equipment types in relation to pipe racks and grouping of pipe lines are applied.



   
Quote
(@banerj1s)
Trusted Member
Joined: 19 years ago
Posts: 65
 

I am very much surprised to see this posting and really cannot wait to see the research facts that can come out with such a conclusion. Please can you send me the facts and figures that lead to such a conclusion?
From my experience every project I have been each isometric has at least gone one revision from its conception to fabrication the highest I have seen is 12. However I expect around 3 and 4 should be the average. It would be my worst nightmare if I had to do them manually.



   
ReplyQuote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

I am confused. Is there a question? Or is there a point that is trying to be made?

The poster titled this as "Producing Isometrics using PDS"
PDS stands for "Plant Design System" You do not produce "isometrics" using PDS, you produce a design of a plant. It is the creation of that plant design that takes the time. It is "Isogen" that produces the isometric.

There is so much more that I would like to say on this subject but I fear I would be misunderstood.



   
ReplyQuote
(@banerj1s)
Trusted Member
Joined: 19 years ago
Posts: 65
 

Jop
You are correct. But due to the fact Isogen is integrated in PDS sometimes people do refer loosely "isometric from PDS".



   
ReplyQuote
Share: