ust identified a couple of 250# steam/condensate lines that are mixed phase (flashing from condensate to steam and…

9 Posts
2 Users
0 Reactions
105 Views
(@bob)
Estimable Member
Joined: 20 years ago
Posts: 59
Topic starter   [#182]

Hi James (and other esteemed piping colleagues),

I've just identified a couple of 250# steam/condensate lines that are mixed phase (flashing from condensate to steam and back again) within my piping system. What are the things that I need to look for when designing this pipe? In the past, I've been forced to re-design control stations to include long-radius bends, laterals, heavier pipe wall, etc.

I know that steam to condensate phase changes form pockets of liquid that may rattle and bang within the piping system. Isn't a considerable amount of energy produced as a result of these phase changes?

Should I go to my mechanical engineer for specific advice?

Thanks,
Bob



   
Quote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

First I have a question.
Is this:
Process Plant related steam ?
or
HVAC related steam?



   
ReplyQuote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

First I have a question.
Is this:
Process Plant related steam ?
or
HVAC related steam?



   
ReplyQuote
(@bob)
Estimable Member
Joined: 20 years ago
Posts: 59
Topic starter  

It's Process steam, James... DP=290psig, DT=550°F, OP=225psig, OT=500°F in between a 1st stage flash drum and eventually to an atmospheric flash drum. It travels between the two drums through a flow control set about 12 meters from the atm. drum.

Then another steam stream travels from the top of the initial flash drum, through a pressure control set resulting in 40# steam to users.

Thanks,
Bob



   
ReplyQuote
(@bob)
Estimable Member
Joined: 20 years ago
Posts: 59
Topic starter  

It's Process steam, James... DP=290psig, DT=550°F, OP=225psig, OT=500°F in between a 1st stage flash drum and eventually to an atmospheric flash drum. It travels between the two drums through a flow control set about 12 meters from the atm. drum.

Then another steam stream travels from the top of the initial flash drum, through a pressure control set resulting in 40# steam to users.

Thanks,
Bob



   
ReplyQuote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

Here is a link to an extensive article about Steam Systems.
Read down each page then click on the "Next" note. It goes on and on and even gives drip leg sizing recommendations etc.
It is far better than I could have done.

http://www.pipingnews.com/steam2.htm



   
ReplyQuote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

Here is a link to an extensive article about Steam Systems.
Read down each page then click on the "Next" note. It goes on and on and even gives drip leg sizing recommendations etc.
It is far better than I could have done.

http://www.pipingnews.com/steam2.htm



   
ReplyQuote
(@bob)
Estimable Member
Joined: 20 years ago
Posts: 59
Topic starter  

hey... thanks very much, James!

Bob



   
ReplyQuote
(@bob)
Estimable Member
Joined: 20 years ago
Posts: 59
Topic starter  

hey... thanks very much, James!

Bob



   
ReplyQuote
Share: