all, What are the m...
 
Notifications
Clear all

all, What are the most basic things to keep in mind while preparing Equipment Layout for Gas Pipeline Stations

8 Posts
5 Users
0 Reactions
110 Views
(@rlpooniya)
Trusted Member
Joined: 15 years ago
Posts: 31
Topic starter   [#452]

Dear all,
What are the most basic things to keep in mind while preparing Equipment Layoutfor Gas Pipeline Stations.

Equipment list-
Pig Launcher/Receiver, Intake Valve station, Knock-Out Drum (KOD), Filter Separators Skid, Water Bath Heater, Pressure Regulating Skid, Metering Skid & Condensate Tank.

Pipeline Size- 30", Natural Gas Transmission Pipeline.



   
Quote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

The most basic things to keep in mind while preparing Equipment Layout for any project:
- Safety
- Constructability
- Operations
- Maintenance



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

I like to add one more category to JOP’s list and that is COST! Having equipment that is piped up with exotic alloys and having them place at opposite ends of the facility, when it would be acceptable to place them side by side, is a better way to go!
You have the major requirements for doing an equipment layout, BUT the real trick is that some requirements have a higher priority over others, and it changes from project to project! A designer’s job is to know those priorities and be able to “juggle” them around appropriately. Not an easy task on some projects!!!



   
ReplyQuote
(@abhijitn)
Reputable Member
Joined: 16 years ago
Posts: 191
 

Another important thing ......the sequence of these important thought are just put in perfectly.
The thought process should start with SAFETY first...& so on..

Thanks to both of you!!



   
ReplyQuote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

Okay let's update the list as we have it so far.
The basic things to keep in mind while preparing Equipment Layout for any project:
- [b]Safety
- Constructability
- Operations
- Maintenance
- Code Compliance
- Cost[/b]



   
ReplyQuote
(@rlpooniya)
Trusted Member
Joined: 15 years ago
Posts: 31
Topic starter  

Okay let's update the list as we have it so far.
The basic things to keep in mind while preparing Equipment Layout for any project:
- [b]Safety
- Constructability
- Operations
- Maintenance
- Code Compliance
- Cost[/b]

Thanks to all of you, now I understood priority sequence...



   
ReplyQuote
(@peter-pyper)
Eminent Member
Joined: 19 years ago
Posts: 36
 

Don't pocket the kicker line at the pig trap.
Make sure there is enough barrel length for the pig including smart pigs.
Set closure end at vehicle height so that pig can be lifted on to a truck.
May need crane access.
Good turn around area for largest vehicle.
Full Port valves.
Don't forget barred Tees.
Enough flexibility for Stress esp. if it is a large pipeline.



   
ReplyQuote
(@rlpooniya)
Trusted Member
Joined: 15 years ago
Posts: 31
Topic starter  

Don't pocket the kicker line at the pig trap.
Make sure there is enough barrel length for the pig including smart pigs.
Set closure end at vehicle height so that pig can be lifted on to a truck.
May need crane access.
Good turn around area for largest vehicle.
Full Port valves.
Don't forget barred Tees.
Enough flexibility for Stress esp. if it is a large pipeline.

Thanks Mr.Peter Pyper,

May I know what are the guidelines to place (or locate) underground Condensate collection Tank & Water Bath Heater in Equipment Layout (In that layout, other equipments are - PL/R, KOD, Filter Separators, Pressure Regulating Skid & Metering Skids for 30" Natural Gas Line).



   
ReplyQuote