If I use a stub in place of a Tee, will it produce any effect on fluid flow or safety/integrity of pipe line?

5 Posts
3 Users
0 Reactions
72 Views
(@saqib)
Eminent Member
Joined: 20 years ago
Posts: 10
Topic starter   [#63]

If I use a stub in place of a Tee, will it produce any effect on fluid flow or safety/integrity of pipe line?



   
Quote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

Saqib,
For us to answer your question we would need more information.
What is the size of the header?
What is the size of the branch(es)
What is the product in the line?
What is the pressure?
What is the temperature?
What is the material?
Where is the job site?
Will the Stub-in be shop fabricated or field fabricated?



   
ReplyQuote
(@saqib)
Eminent Member
Joined: 20 years ago
Posts: 10
Topic starter  

Thank you JOP for your attention.

In fact I am not talking about any particular case. Actually on plant piping I always prefer Tees regardless pipe size and branch sizes because on plant there is always high pressure and high temperature.
But for piping design Out side battery limits of plant, I normally use Tees for small pipe sizes up to 2" dia because fabrication of stub is difficult for small pipes. But for larger diameter pipes I use stubs. Say from 4" dia pipe I will take connection of 2" by stub OR from 4" dia pipe I will take connection of 4" (same size). Temperature and pressure are not too much high out side the plant. Approx 110-150 Psi pressure & 60-80C temp.

So, that’s why some times I get confusion, either I should use Tee or Stub in these cases. Because, I have not found any literature about these things yet.

If you can guide me I will really appreciate you.



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

saqib ...In "general" you only do "stub-in" type branch connections on larger type piping ...say above 12" & on lower press/temp systems. This is a cost saving operation (same with mitered ell.s). But two issues stand out for me here; first doing a size on size stub-in (4" on a 4") is something you want to avoid! Cutting the coupon out WITHOUT getting into the wall of the main header is VERY tricky! The other issue is cost, paying a welder and his helper to cut, shape, bevel, & weld the sizes you have indicated (4") would cost more then if you went out and bought a 4" tee! Hence my suggestion to only consider this type of operation with larger piping. My $0.02 anyway, Good Luck! ...Mark



   
ReplyQuote
(@saqib)
Eminent Member
Joined: 20 years ago
Posts: 10
Topic starter  

So I conclude that there is no hard and fast rule for using stubs. It will depend only on ones good engineering Practices (When & where it is suitable) and also up to some extent of Cost difference.

Thank you Mark for your guidence.



   