The tools in this group are specifically for the well trained and experienced Piper who is currently in a leadership or supervision role.
This person should already know the basics and terminology of piping leadership.
If anyone has any more tools they would like to share, please contact me, on info@pipingdesigners.com/wp/
Title |
Description |
Format |
Typical Project Sequence (Engineering Disciplines) | This simple excel spread sheet is intended to show the relative relationship of some of the major activities of all the eight engineering disciplines from project kick-off to job close-out. | .xls |
Typical Project Sequence (Piping) | This simple excel spread sheet is intended to show the interface relationship of the major activities for the four piping engineering & design groups from project kick-off to job close-out. | .xls |
Piping Scope of Work | This MSWord based Tool was developed to give direction and guidance to the Lead/Supervisor in the development of the basis for the definition of the project. The Scope of Work is the foundation for everything that follows here and on the project. | .doc |
Piping Labor Hour Example | This excel WorkBook was developed to give the Piping Lead/Supervisor the Tools to rapidly and accurately prepare a Labor Hour Estimate for all of the five sub-groups making up the total Piping effort on a project of any size. | .xls |
Piping Labor Hour Estimate Blank Forms | Blank excel forms for Piping Labor hour estimate (above). | .xls |
Piping Control Level Schedule Example | This excel WorkBook was developed to give the Piping Lead/Supervisor the Tools to rapidly and accurately prepare a Piping Control Level Schedule (CLS) for all of the five sub-groups making up the total Piping effort on a project of any size. | .xls |
Piping Control Level Schedule Blank Form | Blank excel forms for Control Level Schedule (above) | .xls |
Piping Physical Percent Complete Status | This excel spreadsheet Tool was developed to be used by the Piping Lead/Supervisor on projects to rapidly indicate the Physical Percent Complete & Productivity status of the major activities that make up the total piping effort on a project. | |
Design Change Notice | This excel spreadsheet Tool was developed to be used by the Piping Lead/Supervisor on projects to log and track the description, hours and status of changes on a project after the labor hour budget has been approved. | |
Piping Historical Data Log | This excel spreadsheet was developed to give a Piping Lead/Supervisor a quick and simple Tool to record key data factors that will influence Labor Hour Estimating for future projects. | .xls |
Piping Line List | This excel spreadsheet form was developed to aid pipers with the concept and needs of a Line List. This form can be modified to add or delete data fields. Note: this document is sometimes called “Line Designation Table” | .xls |