• Creator
    Discussion
  • #5879

    Adam A
    Participant

    Normally, when putting a spec break in a piping system, we do it at the flange. My question is what about if the line is 3/4″ and socketweld? Do we add spec break flanges or can the material for the valve be different from the attached pipe?

    Thanks everyone!

Log in to reply.