-
Discussion
-
Normally, when putting a spec break in a piping system, we do it at the flange. My question is what about if the line is 3/4″ and socketweld? Do we add spec break flanges or can the material for the valve be different from the attached pipe?
Thanks everyone!
Log in to reply.