October 22, 2008 at 5:24 am
#3391
arakeri
Participant
Sir,
1) The commodity is HYDROCARBON
2) Operating pressure & temperature is 13 barg & 230 C respectively
3) Sequence is Gate valve-tapping to OWS-Spectacle blind-Gate valve
4) Drain line comes from low point of exchanger tube outlet line
5) The Closed drain header goes to Hydrocarbon drain Sump drum.
I hope you have got the required information.