Re: P&IDs Review by Piping Engineers in an EPC project

#4089
aubajwa
Participant

——————————————————————–
Title: Key Elements of the P&IDs to be Reviewed by Piping Design Team
——————————————————————–

Dear Jop,

Thanks. I understand what you said. OK Let me be specific.

Being a design supervisor’s point of view, to which extent the design team should go in reviewing P&IDs.
Can you please summarize key elements that must be checked by the Piping Design team.

Regards