Re: P&IDs Review by Piping Engineers in an EPC project

#4141
aubajwa
Participant

Thanks a lot Jop.

Just little more clarification pls.

As for spec you mentioned it should be indicated on downstream of valve.

My concern is: Why we are bringing valve at higher rated side.
And suppose if we have spec breaks that are of same rating each side, Why yet we indicate it downstream of valve.

Regards