- This topic has 0 replies, 1 voice, and was last updated 15 years, 6 months ago by .
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
In piping model, a spectacle which is on a removable spool, is connected to an tube&shell heat exchanger nozzle directly.
My question is: is this configuration wrong? during maintenance, the removable spool including this spectacle is removed, how to prevent fluid inside piping come out?
even there is a valve before this spool, it still can not prevent fluid leakage completely.
Should we put the spectacle before the removable spool?
thanks for your reply.
Copyright © 2024 pipingdesigners.com | Powered by a piping designer