Hi all,
Pls would somebdy would let me know ASME b31.3 criteria for having a two or more braches from a same location of the pipe.
Wonder if this is not going to make pipe less durable in terms of bearing the design pressure? Should the branches be repadded?
Scenario is:
Pipe size – 3 in SCH 40
design presuure – 5618 kPa
Temp – High 253 deg C ### Low 14 deg C
Two branches of size 50 and 25 are being take out from same point.
Regards