Viewing 1 post (of 1 total)
  • Author
    Posts
  • #6870
    jhsunny09
    Participant

    good day, everyone. During hydrotest, if the equipment is on the top, the nozzle is downward, the piping flange is the highest point of whole piping system, how to put a hydrotest vent? Using a isolation blind flange with bleeding valve?

    please forgive my grammar. Is my question clear?

    thanks,

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.