- This topic has 0 replies, 1 voice, and was last updated 14 years, 7 months ago by renyinhui.
-
AuthorPosts
-
April 2, 2010 at 6:11 pm #7218renyinhuiParticipant
RESUME
Cellphone No:(+65)90823190 (Singapore)
Email: renyinhui@hotmail.com
Name: Ren YinHui
Position Applied: PIPING ENGINEER
Nationality: P.R CHINA
Date of Birth: May 59, 1979
Current Residence: Singapore
Marital Status: Married
Languages: English – Chinese – Cantonese
Current Salary: US$ 3000
Professional License: Seafarer Certificate,Oil Tanker Operate Certificate,Oil Tanker Knowledge CertificateEducational Attainment:College degree in Marine EngineeringEDUCATION BACKGROUND1999 to 2002
University: Wuhan University Of TechnologyWuhan, China1992 to 1998Hight school: Xiong Xian Secondary Schoolbaoding ,china1986 to 1992
Chengang primary school
Baoding ,China: Introduction to Plant Design Management System: IT Office Professional Package (MS Word, Excel, Power point, Access): Computer Aided Design (Autocad 2000) 3D & 2D: Piping Calculations (Pressure Drop, Pump & Pipe Sizing,Valves & Material Selection): Plant Design Management System (PDMS) 3D Modelling: AutoCAD 2D and 3D Modelling: CADWorx 2006 Plant Professional 3D Modelling : Tribon M3 (Pipe Modelling, Volumes and Drafting): Microsoft Project
1/4
: Microsoft Office (Excel, Word, Power Point, Project & Access): Adobe Photoshop & Acrobat Application Software: Computer Setup and Installation: Basic Computer TroubleshootingTraining & Seminars: Tribon M3 (Pipe Modelling, Volumes and Drafting): CADWorx 2006 Plant Professional 3D: GPIPE 2004 (A Graphic Piping CAD/CAM System): Team Building Workshop (Tsuneishi Technical Services Phils. Inc.): Total Quality Management (Confederation of ScientificProfessional Organization and Department of Science and Technology)
EXPERIENCE SUMMARYOver 8 years of comprehensive knowledge and hands on experience in the field of Mechanical, Piping Engineering Design, Drafting and Construction. A variety of successful projects for Marine Ship Building, Drilling Rigs,Ship Conversion, Ship Repair, Oil & Gas Offshore Project. I’m fully conversant with Tribon M3 2D Arrangement & 3D Tribon M3 Pipe & Equipment Modelling & Volumes Modelling,PDMS 11.6 3D Pipe & Equipment Modelling, Autocad 3D & 2D Drawing, CADWorx Plant Professional 3D Pipe & Equipment Modelling, . I obtain some Technical knowledge in Engineering Design, Conceptual Layout, Detailed Piping Design, Pipe Supports, Fabrication Drawings, Material Take-off and Supervise the Project during Fabrication, Erection, Installation, Inspection, Commissioning and Testing related to Piping & Mechanical Equipments. I’m fully conversant with ABS Construction Standar, International Standards Code such as ASME, API, JIS, DIN, BIS and other International Regulations relevant to Safety Requirements such as SOLAS, MARPOL and International Classification Societies like ABS, LR, DNV, NK, etc. I am a Team Player with Excellent Organization, Presentation, Communication and Leadership Skills.
EMPLOYMENT HISTORYJan. 2006.7-Present PPL Shipyard Pte Ltd (Singapore)Project: Sembawang Shipyard Pte Ltd (Marine Offshore, Oil & Gas) ProjectPosition: MECHANICAL/ PIPING enginnerProject Involved:Ship Conversion: FPSO (BW Enterpise)– Bergesen WorldwideDrill Ship(Frontier Discoverer)-USA Frontier Company
Drill Ship (Aban Abraham)– Aban Lyod Chiles Offshore Ltd.New Ship: P2022(Jack-up Drilling Rigs)–Egyptian Drilling Company.
P2023(Jack-up Drilling Rigs)–Egyptian Drilling Company.
P2025(Jack-up Drilling Rigs)–Egyptian Drilling Company.
P2026(Jack-up Drilling Rigs)–Sea Drill Management PTE LTD
P2027(Jack-up Drilling Rigs)–Sea Drill Management PTE LTD
2/4P2028(Jack-up Drilling Rigs)–Egyptian Drilling Company.
P2029(Jack-up Drilling Rigs)–SINOPEC International (Hong Kong) Company.Ship Repair & Upgraded: LNG, LPG, VLCC & Oil Tanker
Duties & Responsibilities:
-Piping Designer for Drill Ship Conversion, FPSO, DP2 Pipe Laying Vessel and all types ofShip Repair (LNG, LPG & Oil Tanker) and New Ship Building.-Design a P&ID or Basic Design of each Piping system for Estimation of Material and Project Cost.-Design P&ID in any various Piping System in Engine Room, Pump Room, Sewage Treatment
Mud pit room,sack storage upper & lower,air compressure room,ware house,auxiliary room,boiler room,main deck,living quarters,derrick,drill floor,mud treatment house,VFD Room,mud pump room.double bottom,ect.-Design P&ID Drawing of Hydraulic System for Remote Control Valve, Actuator and Deckachineries.-Calculation of Piping System ( Pressure Drop, Net Positive Suction Head, Pump Sizing,Pipe Material Thickness, Control Valve and Valve selection).-Planning for Mechanical & Equipment Lay-out of the Ships in Engine Room, Pump Room,Compressor & Condensing Unit Room, HPR Trunk for Hipap Transducer Installation of the Drill Ship.-Design and Provide Detailed Piping Arrangement Plan, Isometric Drawing, Pipe Modelling,Pipe SpoolSupport for Construction and Prepare the Material Take-Off (MTO).-Designing and Detailing of Platform and Ladder Assembly, Mechanical and EquipmentFoundation Seat and Outfitting.-Detailed and Layout Arrangement of Pressure Transmitter, Temperature Transmitter, RadarTransmitter, Draught and Level Gauge Transmitter for Ballast and Fuel Oil Tank.
-Pipe and Equipment 3D Modelling using Autocad or Tribon M3 Software.-Study the safety distances between individual Mechanical Equipments, Routing of Pipes &Cables and check the Detailed Drawing before submission.-On-board the Ship to check and verify the suitable routing of Piping and Location Pumps,Hydrophore units, Condenser, Compressor, HPU and other Mechanical Equipments.-Review current P&ID Drawing for completeness according to the Client’s Corporate Standard-Check On-board the P&ID for duplication of equipment and report any duplication, then prepare As-Built Drawing as per onsite Installation.-Maintain and up-to-date Operating Process Engineering Flow Schemes. Site check prior to implement the new Design Project and liaise to the Project Engineer.2004.4- 2006.6 Keppel FELS Offshore & Engineering(Singapore & China ) Position: PIPING engineer cum SUPERVISORProject Involved: B260(Jack-up Drilling Rigs)–DuBai National Drilling Company.
B273(Jack-up Drilling Rigs)–Maersk contractor jack-up
3/4B268(Ultra Deep-Water Semi-submersible Drilling Rigs)–Japan National Drilling Company.
Duties and Responsibilities:-Assigned as Piping Designer cum Supervisor . Responsible toDesign and Isometric view of Piping Arrangement, 3D Modelling,Pipe Spool & Support ,Design P&ID in any various Piping System -Site supervision during Construction and Installation of Pipe and Equipment, includingCost control, Manpower deployment and ensuring all jobs has completed in accordance to the terms and conditions of the contract with the Clients.-Attend Progress meeting with the Client and submit the Progress report of the project.-Procurement of materials and delivered to site in timely manner.-Material Control and Handling Planning of Activities QA/QC.-Planning the Schedule of working activities, Monitor the daily Progress of Project,Distribute the Manpower in there respective area.-Coordinate the Client and Prepare the updated Progress Report of the Project.-Check the Orientation of Pipe Spool Fitted-up Joints and Full Weld Joints in accordance with the Welding Procedure.-Prepare Test Package, Line Check, Pressure Test, Commissioning & Quality ControlDocumentation and Weld Mapping at Isometric Drawing and submit for Client’s Approval.Dec. 2002.4-Jan. 2004.4 – China maritime centre (China·BeiJing.) Inc. Position: Junior EngineerDuties and Responsibilities:-Conversant with Technical and Commercial aspect of the Piping Projects and understand the Job
scope as provided from the Project Manager or Vessel Superintendent. -Monitor implementation and adequacy of the Fabrication Construction and Installation procedures established for the project.-Coordinate with the Design Engineering Department with respect to the Production of shopDrawing and Routing of Pipe System and ensure shop drawing is in compliance with P&IDDrawing.-Planning the production work activities, consistent with Master Production Schedule.-Prepare daily Reports, Progress Report, Fabrication & Installation Reports, Hydro TestReport, Pipe Line Dimension Check Reports and Pipe Line Tally Sheets.-Monitor the daily Progress Report and ensure that it is ahead by the schedule.-File all Technical Projects Documents received and maintain updated documents relevant to drawing list. Reproduce and distribute all Technical documents required forFabrication, Installation and Construction.-Make a certain quality workmanship to comply with good marine practices as per currentShipbuilding Quality Standards & Practices-To handle ad-hoc projects or duties as assigned by the management when required.4/4
-
AuthorPosts
- You must be logged in to reply to this topic.