We have used PIP standards for platforms and ladders requirement for Process equioments.
Refer below link for more details..
http://www.ihs.com/products/industry-st … index.aspx
We have used PIP standards for platforms and ladders requirement for Process equioments.
Refer below link for more details..
http://www.ihs.com/products/industry-st … index.aspx
I found following link while googling for Fin-fan cooler thrust block.
http://www.scribd.com/doc/59286500/Air-Cooler-Analysis-Solution-in-Ceasar-2
I found following link while googling for Fin-fan cooler thrust block.
http://www.scribd.com/doc/59286500/Air-Cooler-Analysis-Solution-in-Ceasar-2
I was told that when there are more than 8 units of air cooler, thrust blocks are used to transfer lateral movement of individual units to compensate header movement.These blocks are placed in between units. But I haven’t seen such an arrangement of thrust blocks.
I was told that when there are more than 8 units of air cooler, thrust blocks are used to transfer lateral movement of individual units to compensate header movement.These blocks are placed in between units. But I haven’t seen such an arrangement of thrust blocks.
What about condensate return header..? It should be free draining towards collecting vessel.
What about condensate return header..? It should be free draining towards collecting vessel.
Thank you sir..!!
Thank you sir..!!
Do we need to consider flange dimensions (for large bore pipe), even if we dont have a flanged connection in a pipe line, while deciding the pipe to pipe spacing.
Do we need to consider flange dimensions (for large bore pipe), even if we dont have a flanged connection in a pipe line, while deciding the pipe to pipe spacing.
Dear Jop,
I cannot thank you enough for the flawless explaination that you’ve been offering on this forum.
Thanks again..!!
Dear Jop,
I cannot thank you enough for the flawless explaination that you’ve been offering on this forum.
Thanks again..!!
Thank you for the reply Jop, can u clarify more about
Vessel dressing plan (Horizontal before erecting or Vertical after erecting).
Also who is the final authority for deciding Tray spacing Mechanical dept or vendor.