saqib

Let other Pipers know:

Forum Replies Created

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • #1876
    saqib
    Participant

    Is there any code or standard or any other technical reference for this?

    #1343
    saqib
    Participant

    So I conclude that there is no hard and fast rule for using stubs. It will depend only on ones good engineering Practices (When & where it is suitable) and also up to some extent of Cost difference.

    Thank you Mark for your guidence.

    #1341
    saqib
    Participant

    Thank you JOP for your attention.

    In fact I am not talking about any particular case. Actually on plant piping I always prefer Tees regardless pipe size and branch sizes because on plant there is always high pressure and high temperature.
    But for piping design Out side battery limits of plant, I normally use Tees for small pipe sizes up to 2″ dia because fabrication of stub is difficult for small pipes. But for larger diameter pipes I use stubs. Say from 4″ dia pipe I will take connection of 2″ by stub OR from 4″ dia pipe I will take connection of 4″ (same size). Temperature and pressure are not too much high out side the plant. Approx 110-150 Psi pressure & 60-80C temp.

    So, that’s why some times I get confusion, either I should use Tee or Stub in these cases. Because, I have not found any literature about these things yet.

    If you can guide me I will really appreciate you.

    #1276
    saqib
    Participant

    Mr. JOP…! Thanks alot for your guidence.

    Can you kindly tell me that both these words WPB & WCB has any abbreviation or they are just alphabet assigned to these standards?

    #1270
    saqib
    Participant

    Can u provide me your e-mail? I will send you some related documents as attachments.

Viewing 5 posts - 1 through 5 (of 5 total)