Pad / Stub-in & out connections

  • Sachin
  • Sachin's Avatar Topic Author
  • Offline
  • Junior Member
  • Junior Member
More
15 years 3 months ago - 15 years 3 months ago #7465 by Sachin
Pad / Stub-in & out connections was created by Sachin
A 10” pipe branch is taken from 12” pipe header .
Service : Cooling water
Pipe MOC : Galv CS A53 FBW/ A53 B/ API 5LB ( Galv is for small bore viz. upto 2” only )
Corrosion Alwc : 0.125”
T & Pr : -20 F to 366 F @ 150 psig
Piping Specification requires stub - in connection for 12” x 10” .
Caeser II software requires Pad .
PDS software shows RWELD without Pad .
Pl. give the correct procedure & share info regarding pad requirement for Stub - in / out connections .

Thanks

Please Log in or Create an account to join the conversation.

More
15 years 3 months ago - 15 years 3 months ago #4918 by Jop
Replied by Jop on topic I would make a reinforcing
I would make a reinforcing pad out of the 12" pipe material and a minimum of 5" wide.

Do it once and Do it Right

Please Log in or Create an account to join the conversation.

Moderators: Jop
Time to create page: 0.161 seconds