PipingDesigners Community

A place for piping designers, engineers and industry professionals to ask questions, share experience, discuss technical topics and connect with other professionals.

Browse the discussions below or start a new topic. Please keep discussions practical, professional and relevant to the piping and engineering community.

Rameshwar Pooniya
@rlpooniya
Trusted Member
Joined: Sep 20, 2011
Topics: 13 / Replies: 18
Reply
RE: Can we run Instrument Air in underground ??

11echo, Thanks for sharing educative conversation along with your own opinion. Such efforts of senior members are highly appreciated....

11 years ago
Forum
Topic
Forum
Replies: 2
Views: 0
Reply
RE: Can we run Instrument Air in underground ??

Thanks JOP @11echo, These transformers are installed in open area with three side firewalls and one side gates. Requirement of firewater deluge sy...

11 years ago
Forum
Topic
Forum
Replies: 5
Views: 0
Reply
RE: I have a situation where we need to run 4 number of 20" pipelines together after the respective metering skids

I think 1 M clearance between two above ground pipelines is more than enough. Keep closer..... 300mm cleareance is enough

13 years ago
Forum
Reply
RE: In symmetrical air cooler / Heat Exchanger piping why Tee with end cap are used instead 90 degree elbow Is it…

Take a REAL close look at the drawing of the header piping and the answer will be clear! The subjected concept is still not clear, please educate me....

13 years ago
Reply
RE: tuations seems ok by now ....BUT the issue arises when i plan to route such vent ...viz.. how we decide by which…

As per my own experience, ATM Vent shell not be less than 3M from highest operating platfrom / grading in nearby area. But it may vary project to proj...

13 years ago
Reply
RE: all, In Scraper Launcher & Receiver which reducer (Conc. or ECC) to be used and why?

Thanks all of you for sharing your knowledge n experiece. Unfortunately I couldn't get complete answer.

13 years ago
Forum
Reply
RE: Is it necessary that minimum 1D spool required between an elbow and a fitting... does any code say so..?

I haven't seen such thing in codes. In some sizes we need pup piece between Tee & High rating Flange (flange for valve installation) for bolt remo...

14 years ago
Forum
Reply
RE: fter finishing the isometric dwg the BOQ is listed in the same for fabrication process..Somebody calling it as…

Well explained by Mr.JOP. I remember you are same question in same manner couple of months ago and that time it became clear for me. Thanks a lot.

14 years ago