1. A pipe piece is of plain ends with no component on it. Should we
place it in Shop or in Field?
2. A pipe piece is of bevel ends with no component on it. Should we
place it in Shop or in Field?
3. One end of pipe is PE & other BE. Whether Company Stock code is
needed for BExPE or not?
Thanks
1. Field
2. Field
3. Not enough information.
1. Field
2. Field
3. Not enough information.
For third query,
I mean to say whether PE pipe can be made to BE pipe at site &
whether BE pipe can be made to PE at site.
As per my understanding these do not require company stockcode so these can be placed in Field or supplied as loose item.
Thanks
For third query,
I mean to say whether PE pipe can be made to BE pipe at site &
whether BE pipe can be made to PE at site.
As per my understanding these do not require company stockcode so these can be placed in Field or supplied as loose item.
Thanks
Can PE pipe can be made to BE pipe at site? Yes! and it will not change the length.
Can BE pipe can be made to PE at site. Yes! but to do so you must cut off the bevel end and thus it will change (shorten) the length of the pipe.
Can PE pipe can be made to BE pipe at site? Yes! and it will not change the length.