Are you positive they are referencing threadolets as your branch connection? On an oil pipeline my experience says that your connection would be a soc...
Pio, I'm not sure why your being sarcastic. You weren't even part of this post. Jop I love how you answer questions....you try to answer based on wh...
Jop, I can't speak to board drafting and the good old days where you thought out every aspect of a plant large and small. The problem now days is no o...
Like piolopaskual said, Thermowells are long and can be installed in the elbow or in a straight run of pipe. In most situations (minus LP piping), if ...
Jop is very correct and you may see these differences in how you produce your MTO's. As a general rule of thumb though 2" and above is considered lar...
Sorry Guys, One pump station with 3 huge pumps. Pipeline comes into lease through a pig receiver to a header for the 3 pumps. Crude goes through pump ...
General rule..... Liquid take-off from the bottom to allow draining so no low points that could freeze or plug. Vapour take off to the top to avoid hi...
I think Jop is correct here. If the insulation thickness tables are already created by whomever and the temps are determined by Process then the desig...
I think Anton's and Jop's answers say it best. Your very vague with what your actually installing. There may be no upstream/downstream distance becaus...
Just a thought...... We spent time in this thread and many others trying to estimate why there may be a spec/rating break at the pump flanges. It's g...
Jop you are correct. That was sort of what I was trying to say. A question should be the end result in both cases to find out if there's a bigger desi...