PipingDesigners Community
A place for piping designers, engineers and industry professionals to ask questions, share experience, discuss technical topics and connect with other professionals.
Browse the discussions below or start a new topic. Please keep discussions practical, professional and relevant to the piping and engineering community.
Never tried such arrangement before but have seen several on existing plant built by one respected EPC contractor during the 90s (not sure though if t...
Preferred is upwind. But it can alternately be located on the sidewind. At some instance where it cannot be really avoided, the stack may also be loca...
Preferred is upwind. But it can alternately be located on the sidewind. At some instance where it cannot be really avoided, the stack may also be loca...
-Line list is developed using P&ID. -Iso drawing containing process data should be consistent with line list and P&ID. -A high level estimate...
-Line list is developed using P&ID. -Iso drawing containing process data should be consistent with line list and P&ID. -A high level estimate...
We have used 1:4000, 1:6000 and at most 1:10000 for the overall plot plan in our past LNG projects. The scale has depend on the necessity to show vita...
Where I work, Plot plans are classified into following: -Site Plan (contains reference points and general locations of major facilities such as proce...
Sirs, Hope you can help me with this, Scenario: 2 Asphalt tanks of same capacity to be placed inside dike area. Should the dike capacity still nee...
