Well let's see what's wrong with the 3d model from a design standpoint?
PDMS CAD 3D MODEL REVIEW on Youtube
The model looks great from afar.
This obviously is not a real unit, because there is way too much wrong.
Lets see if you guys can list some of the obvious wrongs from a "piping Design" standpoint.
Maybe some of these young CAD jocks who think modeling is designing can learn a thing or two from the seasoned designers here.
So, please force yourself to watch the video and start listing some of the obvious mistakes.
http://www.youtube.com/watch?v=mMnP9tpW ... r_embedded
To be fair, when we look at this model and comment on it, we should only comment on what is shown, not what is not shown. After all, some of the layers (or levels) may be turned off. Hence, something we would expect to be there is not there.
Dead legs! All over.
Take offs from the bottom.
Piping run over equipment.
Piping accross walkways/platforms.
To name a few...
Boy I see a number of “issues”! …First that pops out at me, and maybe cover under JOP’s comments about a “Layer” being turned off, is individual piping supports …I don’t see ANY! ..Along that line, ALL the piping running in the pipeway seems to be floating 3” to 6” above the horizontal support!?? I don’t know if pipe shoes are on the same layer? (Interesting all the pipes in the pipeway seems to have that issue! I don’t think I have ever seen where ALL piping in the pipeway has pipe shoes!??) …Giving them the benefit of the doubt, the next issue is:
- location/orientation of the heat exchangers! I’m seeing major maintenance issues trying to pull the tube bundles! This area needs to be easily accessible and clear!
- Also I see a lot of vessels that have been “caged-in” by the associated piping! Again causing maintenance issues!
- Seems to have a lot of piping that is run as an individual line as apposed to running them together in a pipeway.
- Another thing I noticed was there seems to be a lot of piping that is a tripping hazard up on the platforms and walkways! (As someone stated earlier)
- The last thing I noticed …and this is minor, there are no “drop-bars” on the caged ladders
This topic is also running on the piping designers group on LinkedIn -> LinkedIn Piping Designers Group
Paul commented that:
The video was no doubt intended to be a demo of what is possible, not an example of good design.
Mea culpa for linking to it at PipingDesign.com I guess.http://pipingdesign.com/viswan_wright_w ... ver_be.pdf might be a good read.
I am president of SPED Calgary and we're doing our best up here to educate pipers about our fascinating choice of profession.
Regards,
Paul
PipingDesign.com
http://spedcalgary.typepad.com/
I think it's a very good demo.
It does show what's possible, but I think it's just as important that it shows up the fact that not all nice, shiny, rendered 3D models are the last word in piping design and plant layout.
This video can be used as an example of a practice that is now a part of our industry and is a practice that is detrimental to piping as a profession.
This is the practice of hiring young guys who are "fast on the buttons" in favour of seasoned pipers.
I'm not saying that youth shouldn't be given a chance, but if a company hires Cad Operators when they should be hiring Senior Pipers, this is the kind of design they can expect.
What this model shows is a basic lack of training on the part of the Cad Operator who modeled it.
The problem is "the spec let me put it in" mentality.
This video needs to be held up as an example of why companies must invest in Senior Designers AND invest in training for the young guns.
I'm a big fan of SPED and the work SPED does in educating pipers and hopefully more and more companies will look at the value that SPED is bringing to the table.
Some of the comments that have appeared on LinkedIn: http://lnkd.in/jSwJ7Z
Models like this one could even be used in an interview process for potential designers. You could sit a prospective candidate down to view it. You could then discuss together
the model, probe him for his feedback and get an idea if he can spot THE OBVIOUS!Wouldn't it be great, if you let the guy view the model and proudly claim that you feel that this is an example of your companies "best work". And then listen for his feedback. You could check his honesty also!!!!
Did anybody see that almost evey vessel did not have isolation valves or relief valves? I really like how there is a "Port hole" (a really big hole in the middle of the platforms which you fall through as you are hopping over or ducking under piping) through the access platforms.
Comments on comments above. "... a demo of what is possible, not an example of good design..." One could put tires on top of a car model to demonstrate capabilities of modeling software, but I personally would make my examples]
So much wrong, I'd run out of red ink.
Access, blocked egress, workability.
Good comment testing the mettle of prospectives.
I wouldn't call this a bad design, but more as a test to see if one knows what they are looking at.
As long as the OD is bigger than the ID, shouldn't be any problemA 3D model done by a cadster is great for conceptual presentation but if done without basic design standard practices it will more likely shoot your co. in the foot before obtaining work.I've learned 3D on a design job and found it great to be able to see my design conceptualy before the pipe was even delivered.Bottom line it dosen't matter how nice it looks on a picture or a screen but will it work in the real world.
The layout guy has no awareness of erection and maintenance. The rack is designed as an enclosure not a backbone. Many short straight runs of hot pipe between nozzles. No access to manholes from road, in fact no access to anything.Afraid to look deeper.So much work and wasted!
1. I didnt see a single support!
2. Process point of view no drain connection(Many cases).
3. Flexibility analysis not done
4. A lot of crisis on layout.
5. Opening of Exchanger channel
6.Crisis when making scafolding as no structure near(Many cases)
7. Mobile crain/fork lift space
8. Access/Access/Access each item valve , instrument must be accessible.
More over Pump with motor maintenance space missing.Obviously not a pipe designers demo here. I agree this might be a good quiz for interviewing prospective pipe designers.
Little or no check valves in the centrifugal pump discharges.
No operational bypasses around exchangers.
No drop out spools for pulling bundles.
Ladder cages with little or no room for workers.
Ladder cages non radial to vertical vessels.
Round holes in ladder penetrations on vertical vessel? That’s a new one.
Slanted stairs on vessel platforms. Come on really?
Stairs look way too narrow.
Tripping hazards on almost every pipe run everywhere.
Bundle ends of exchangers with no means of access or removal, extending over pumps and other obstructions.
One exchanger bundle cannot be removed without completely removing another exchanger in front of it.
No thought put into proper plant layout at all
All the equipment tucked nicely between two pipe racks running the entire length of the unit. What?
Absolutely no thought put into proper piping support at all.
Furnace/heater a few feet from vertical vessel and in the middle of the unit. Whoops!
Furnace with heat stack at platform elevation. Stay off that platform!
Piping run improperly down vertical vessels. The pipe support designer will love you for that one.
Piping run across platforms on vertical vessel instead of down through penetrations.
I haven't seen the first PRV anywhere. Stay off that unit!
No isolation valves or spec blinds at hardly any nozzle
Control valves in front of stairways. Please don't step back while turning a block valve.
Steel layout in pipe rack all wrong.
Steel stringers are normally offset from bent elevations to support piping.I could keep going but I'm exhausted, I'll stop now but this was fun.. Thanks for the post. Brings back memories from my days on the dradfting board and whipping young designers into shape.
Few of them which I can see
-Flat turning pipes
-Headroom is not clear in most of the cases
-Flexibility requirement for the lines connecting the heat exchangers need to be verified, need flexibility.
-Supporting possibility not checked properly, lines without supports or tall supports from ground
-Platforms on the tower / equipment are provided at very low level (unncessarily)
-Heat exchangers bundle pull out area, is a problem in the model
-Tripping hazard, pipes are runnin close to the ground, even walkways are blocked many time
-Distance between the two circular platforms on the tower is too much, not as per the industry standard (Risk)
-Foundations of the columns?
-Equipment access is blocked because of the piping around it
-Forklift access is blocked below the piperack
-Bunch of lines can run together, here they are not done the way we do normally
-No thought given on Pipe supporting possibility
-Valves are not operable in many cases
-Orientation of the valve handwheels not done properly, many times it is not towards the operator instead are in odd degrees
-Due consideration to the allowable loads on the nozzles has not been given & is a safety concern. Loads due the piping connected.