Normally, when putting a spec break in a piping system, we do it at the flange. My question is what about if the…

8 Posts
4 Users
0 Reactions
100 Views
(@newdam07)
Trusted Member
Joined: 15 years ago
Posts: 32
Topic starter   [#493]

Normally, when putting a spec break in a piping system, we do it at the flange. My question is what about if the line is 3/4" and socketweld? Do we add spec break flanges or can the material for the valve be different from the attached pipe?

Thanks everyone!



   
Quote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

It's rare to have flanges at that size, from my experience you'll see unions used and the spec break is located there. BUT if you're following a piping spec that dicates the use of flanges then it will be at the flange set.



   
ReplyQuote
(@newdam07)
Trusted Member
Joined: 15 years ago
Posts: 32
Topic starter  

yes, I don't see any union in the pipe spec, so I guess flanges is the way to go.

I'm just curious, is it possible to weld a pipe and socketweld valve with different pipe spec?



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

Yes it's possible, I've seen a piping system (with same commodity) where it exited a building into artic conditions so there was a spec break at the wall with a block valve, cold temp steel (A333-6) on one side and the normal indoor spec steel (A106-B) on the inside.



   
ReplyQuote
(@abhijitn)
Reputable Member
Joined: 16 years ago
Posts: 191
 

Can you specify the Spec-Break first? What is the intended change? Is it Class# change? Or Material change?

Then it will be more clear to answer the way to achieve the type of spec break.



   
ReplyQuote
(@abhijitn)
Reputable Member
Joined: 16 years ago
Posts: 191
 

Can you specify the Spec-Break first? What is the intended change? Is it Class# change? Or Material change?

Then it will be more clear to answer the way to achieve the type of spec break.



   
ReplyQuote
 hc
(@hc)
Estimable Member
Joined: 20 years ago
Posts: 96
 

Hey Guys,
My experience has been typically that the spec break is at the valve not a union or misc. set of flanges. This won't matter if its flanged, socketwelded or threaded. The valve is included in the higher rating. Now an exception to this may be between a facility to pipeline spec break(b31.3 - Z662). Generally though even then your changing spec at the valve. Usually when a spec break occurs (and this is generally) at a building wall its usually a insulation/ET break only. If I see a spec break at a misc. set of flanges or a union I would automatic question it either on your drawing or on the P&ID. Hopefully this is what your asking.
HC



   
ReplyQuote
 hc
(@hc)
Estimable Member
Joined: 20 years ago
Posts: 96
 

Hey Guys,
My experience has been typically that the spec break is at the valve not a union or misc. set of flanges. This won't matter if its flanged, socketwelded or threaded. The valve is included in the higher rating. Now an exception to this may be between a facility to pipeline spec break(b31.3 - Z662). Generally though even then your changing spec at the valve. Usually when a spec break occurs (and this is generally) at a building wall its usually a insulation/ET break only. If I see a spec break at a misc. set of flanges or a union I would automatic question it either on your drawing or on the P&ID. Hopefully this is what your asking.
HC



   
ReplyQuote