Adam A
@newdam07
Trusted Member
Joined: May 9, 2012
Topics: 14 / Replies: 18
Topic
Replies: 1
Views: 0
Topic
Replies: 0
Views: 0
Reply
RE: ! This sounds unusual but the process is requiring a 6" x 5" reduction of the line and it is indicated to use a…

Jop, The Process Engineer is the licensor. We can ask the licensor but it would take time before they respond (if ever they respond). My scope is the ...

13 years ago
Reply
RE: ! This sounds unusual but the process is requiring a 6" x 5" reduction of the line and it is indicated to use a…

Jop, The Process Engineer is the licensor. We can ask the licensor but it would take time before they respond (if ever they respond). My scope is the ...

13 years ago
Reply
RE: ! This sounds unusual but the process is requiring a 6" x 5" reduction of the line and it is indicated to use a…

There's a catalyst in the line, 320 °F, 5 psig. The line is coming from a reactor then sloping down a vessel. After the slope, there is a vertical sec...

13 years ago
Reply
RE: ! This sounds unusual but the process is requiring a 6" x 5" reduction of the line and it is indicated to use a…

There's a catalyst in the line, 320 °F, 5 psig. The line is coming from a reactor then sloping down a vessel. After the slope, there is a vertical sec...

13 years ago
Reply
RE: what is the difference between full size and reducing size weldolets?

Thank you Jop. I just want to know the difference between the 2. We sent our our pipe iso with instrument connection to the instrument vendor and the...

13 years ago
Forum
Reply
RE: I have a P&ID that shows a spec break at the control valve

Jop, First, our process people designed the line to be 150# and our instrument engineer prepared the requisition for the 150# CV. But during client re...

13 years ago
Forum
Reply
RE: ting the bill of materials (BOM) and piping and structural drawings, I would let our detailed design contractor use…

First, thank you for your replies. "Our client" = refers to end user &/or EPC. At this stage in the proposal, I still don't know the commercial a...

13 years ago