Reply
RE: ed open and one is spare) and it was placed in the vertical. The line is going up the structure which means the…

Looking closely at the P&ID, there is also nitrogen coming in the header where the PSV is tapping from.

13 years ago
Forum
Reply
RE: ed open and one is spare) and it was placed in the vertical. The line is going up the structure which means the…

Air. operating temp is 100 deg F. What do you mean by wall? It is an open structure and it is venting at the highest point of the structure. Can we se...

13 years ago
Forum
Reply
RE: ed open and one is spare) and it was placed in the vertical. The line is going up the structure which means the…

Discharge line is 6". After the block valves the discharge line tie together and go up the structure to vent to atmosphere. From the junction to atmos...

13 years ago
Forum
Reply
RE: everyone, If there is a free draining requirement, does it mean it has to be sloping?

Thank you JOP & 11echo! If there is a direction for the free draining, does it mean we have to slope down to that direction? I just want to keep ...

13 years ago
Topic
Reply
RE: Normally, when putting a spec break in a piping system, we do it at the flange. My question is what about if the…

yes, I don't see any union in the pipe spec, so I guess flanges is the way to go. I'm just curious, is it possible to weld a pipe and socketweld val...