Reply
RE: 10 mtr. tier. The vertical leg at battery limit is having a drip leg kind of arrangement. I raised this issue with…

I have had this problem from time to time. Jop's method of a secondary KO Drum is best and safest and should be the first choice. I have however had t...

14 years ago
Reply
RE: Hey Guys, My brains mush. If I have a branch into a header of same pressure is a check valve req'd or just a block…

Generally speaking you place a check valve where it is not desirable to have backflow. This is common in some instances like pumps where we don't want...

14 years ago
Forum
Reply
RE: 2. How to prepare MTO from P&ID (Suppose we have only P&ID….NO GAD, NO Plan Layout…) How to calculate Pipe…

That is why you have a Plot Plan. You can then do a routing study or transposition. This can be complimented with some hand drawn Isos to establish a ...

14 years ago
Reply
RE: all Pipers I am Designing a Modular Pipe Rack

Pipe rack modules would usually be spaced 6M apart. The field weld is on the overhanging pipe between modules of 3M. Sloping lines are not an issue as...

14 years ago
Reply
RE: All, My company has decided to move the fabrication of small bore piping from the field to the shop to reduce field…

I notice you come from Calgary Flow8. As you are aware much of the work that we do is modularised which breaks out into module - shop and stick built ...

14 years ago
Reply
RE: all, In my little experience, I notice that PI & TI instrument nozzles are only installed on top side of pipeline.…

In some cases if the pipe spec allows it you may be able to insert the TI on an elbowlet.

14 years ago
Forum
Reply
RE: all, What are the most basic things to keep in mind while preparing Equipment Layout for Gas Pipeline Stations

Don't pocket the kicker line at the pig trap. Make sure there is enough barrel length for the pig including smart pigs. Set closure end at vehicle hei...

14 years ago
Forum
Reply
RE: Hey Guys, Question: Why am I not seeing any steam traps on the Steam injection piping on a Wellpad?

If the Condensate drains down the well then there is no danger. It is when condensate gathers and ponds that water hammer can occur. If the Condensate...

15 years ago
Reply
RE: Ok guys, Anyone ever hear of a flatolet

I have used them where I'm in a tight spot and put a drain on an eccentric reducer FOB. They were large diameter reducers.

15 years ago
Reply
RE: ce access, safety etc also play important roles as well. Can you guys give us some good reasons why it is better to…

11echo nailed it. The pipe basically has to be stress relieved due to the affected heat zone due to welding. This is safer to have that minmum pup len...

15 years ago
Forum
Reply
RE: Liquid slurry piping systems transport solid particles entrained in a liquid carrier

I have used both Pinch valves and kife gate valves in slurry service. The knife gates tend to work better with large pneumatic actuators for piping wh...

15 years ago
Reply
RE: fter finishing the isometric dwg the BOQ is listed in the same for fabrication process..Somebody calling it as…

Very good description Jop and is still how we do it today with some minor adjustments as per individual client and project requirements. On some of th...

15 years ago
Forum
Reply
RE: This question has been bothering me for a while now. What is the best possible way to approach, the bulk material…

It also depends on your budget at FEED stage. I have been on large projects where we built a 3D model to do the MTO for the owners. If there are a lot...

15 years ago
Forum
Reply
RE: Which design considerations do I have to take if for some reason I have to bury (in the ground) a steam line with no…

A steam line can be buried for 500 feet or so in a sleeve but the stress must be calculated and handled within that sleeve. You may get uplift and req...

15 years ago
Reply
RE: all Pipers I am Designing a Modular Pipe Rack

If the commodity is high pressure, high temp steam of say 320 degrees C then I agree there should be no flanges. A line like that would have all welde...