all Pipers I am Des...
 
Notifications
Clear all

all Pipers I am Designing a Modular Pipe Rack

12 Posts
6 Users
0 Reactions
129 Views
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter   [#401]

Hi all Pipers
I am Designing a Modular Pipe Rack . The Pipe rack is around 54 meter in length and I am dividing it into 4 parts (i.e. sub modules).
The pipe rack has 2 tiers with around 15 lines having the high pressure high temperature steam in it with around 2 % slope.
My concern only is how the site people will do welding at interface points between the sub-modules .
If any body has experience on site that how we usually weld the pipes on rack . Please share.
Regards
SG



   
Quote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

Are you trying to get these "modules" to butt up end to end? "IF" so I'd flange the ends so all the field people need do is bolt it up. Failing that I'd still flange the module ends and have the field just fab spool peices to link the units. Trying to butt up plain end pipe in a "bundle" and weld it would a MAJOR pain!



   
ReplyQuote
(@willis)
Active Member
Joined: 19 years ago
Posts: 18
 

No physical site experience with this but most projects I have worked on with modular pipe racks were welded connections for metallic pipe. As far as I am aware the installations went well.

A field weld at module interfaces, in my opinion, is the most economical and reliable method. The cost of fittings/ materials, shop welds, field install (bolt torquing/ tensioning), and inspection for a flanged joint would far exceed a welded connection for high press./ temp piping. Also, you increase the number of potential leak points at each interface.

Just my $0.02.



   
ReplyQuote
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter  

@echo ...these are very high pressure and high temperature lines so no point even in thinking of flanges code doesn't allow it.
@willis ....my only concern is interface between two sub modules .n would it be possible to maintain slope in 4 parts
Regards
SG



   
ReplyQuote
(@shrivallabha)
Estimable Member
Joined: 17 years ago
Posts: 134
 

SK,
I had not come across this concept before this post. So thanks for the information posted. I just checked for this particular tag and following information looks good. However, there is very little from piping design point of view. Since you are in a stage ahead than preliminary so it may not be that useful but I am just posting the links in case if you have not considered any of the points discussed:
http://civildesignhelp.info/pr3.html
http://www.modularaccess.com/Pipe-Rack.aspx

The only concern that comes to my mind is:
You will need to finalize all the Routings and Loadings on these racks in advance and revisions at later date may prove difficult as well as costly.
Rgds,



   
ReplyQuote
(@willis)
Active Member
Joined: 19 years ago
Posts: 18
 

@willis ....my only concern is interface between two sub modules .n would it be possible to maintain slope in 4 parts
Regards
SG

I don't see how a sub-module interface would be different than a module to module interface. Please explain further.

To maintain the designed slope on the modules, you could provide TOS or shim heights at each support location to module steel fabricator to install prior to the piping spools. In my experience, this has been the most cost effective and easiest method of achieving this. Further shimming can be done if required in the field for final fit-up between modules and sub-modules.



   
ReplyQuote
(@11echo)
Reputable Member
Joined: 20 years ago
Posts: 332
 

Field welding would be "great" if the welder had enough access 360 Deg.s around every pipe in this module, AND IF that's the way it has to be then you better design that aspect into the module design, but you're going to burn up alot of space in the piperack!
NO FLANGES?? ...So what is the system pressure?



   
ReplyQuote
(@willis)
Active Member
Joined: 19 years ago
Posts: 18
 

Here is a link I found showing a 60' module with pipe sizes ranging from 2" to 48". Also, SPMT transporting module through plant-site. Normally, we use normal pipe spacing and do not provide addition space for field weld. Pipe fitters use to these module fit-ups are able to manage.

http://www.westheatherbrae.com/blog/?currentPage=7



   
ReplyQuote
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter  

@Shrivalabha.......the Pipe rack is already designed according to the loading I am dividing it into four parts along with piping ,supports cable trays and all.
so i am not so concerned about calculation and theortical part ;my main concern is practical one.
@ Willis .....thanx a ton boss ur feedback are quite impressive.

few other queries:---
In this module concept i would have to do hydrotest twice once at shop and then at site Does ASME permits that?

Do you really think its equivalent that i make four spools and then weld them at site by maintaining proper slope of arnd 3% in pipe
OR by making a long spool at shop having the slope of 3% then cutting it into four parts and again joining them on site

Regards
SG
" Be not afraid of going slowly; be afraid only of standing still"



   
ReplyQuote
(@peter-pyper)
Eminent Member
Joined: 19 years ago
Posts: 36
 

If the commodity is high pressure, high temp steam of say 320 degrees C then I agree there should be no flanges. A line like that would have all welded connections, even the valves. Pinhole leaks from flanges could be serious HSE concerns as well as difficult to locate.
Field welds would be the best way to mate the modules. If you are concerned for fit up make it a field fit weld and add say 300mm of pipe which is cut in the field and welded.

With 3D models we now get precision and accuracy with module installation. If it works in the model it should in the field. As for shims be careful with the shoe movement. If you have a high temp line then you can get considerable thermal movement. You can also get uplift and your guides have to be designed accordingly. You may have a long shoe to accomodate movement. The project I am working on has steam lines which are moving up to 1.5m for a 36" line so our shoes are 900mm long in places.



   
ReplyQuote
(@peter-pyper)
Eminent Member
Joined: 19 years ago
Posts: 36
 

Pipe rack modules would usually be spaced 6M apart. The field weld is on the overhanging pipe between modules of 3M. Sloping lines are not an issue as we do these all the time especially flare lines. There are different ways and methods to support and slope the lines. Trimmed shoes, shims, goalpost supports are all used on modular racks. The piping gets tack welded in shipment which is easily broken at site for movement of the pipe to align for field welding.
As for hydro testing it is normal to hydro the module seperately and then do a system hydro test once installed at site.
We would normally build a 3 bay module which are 6M long each per bay. This would then get shipped to site with a 6M gap between mods.
The rack gets lifted on to it's piles and the pipng then lined up. This is routinely done in this part of the world with piperacks that can be 5 levels high and double wide.
Dimensions must match shipping sizes on the roads in the area which you are constructing. There can also be seasonal road bans which can affect transportation.
Hope this helps.



   
ReplyQuote
(@abhijitn)
Reputable Member
Joined: 16 years ago
Posts: 191
 

Really helpful to get such guidance from the guys who already dealt with these kind of projects.

I am new to the modular design concept so felt these modular things are dificult to do however after I read your reply I am feeling little bit comfortable now to go about it. Thanks for that...

Peter,
With reference to your post, it seems that even if we do all the things mentioned for modular piperacks there is considerable amount of work still involved at site like aligning all the piping for welding by removing tack welds, Hydro testing (second time) etc.

Considering the amount of work at site is it worth doing all the piperack in modular way or it is better if we do the piperack part of the plant in conventional way & rest of the things in modular way?
Of course, you must be knowing better & shed some more light on the same.

waiting for your reply.



   
ReplyQuote