PipingDesigners Community

A place for piping designers, engineers and industry professionals to ask questions, share experience, discuss technical topics and connect with other professionals.

Browse the discussions below or start a new topic. Please keep discussions practical, professional and relevant to the piping and engineering community.

Shrivallabha Redij
@shrivallabha
Estimable Member
Joined: Aug 29, 2009
Topics: 37 / Replies: 97
Reply
RE: all..in designing pump suction piping, where is the best location for the top flat eccentric reducer?

Take a look at the following discussion which went on "linkedIn". There are some detailed and animated replies of the members: I remember vaguely, so...

15 years ago
Forum
Reply
RE: ! i just want to clarify the slope symbol in P&id. (im working on PDMS) if just the triangle is shown in the line is…

hi! i just want to clarify the slope symbol in P&id. (im working on PDMS) if just the triangle is shown in the line is it still need a slope in ...

15 years ago
Forum
Reply
RE: I'm wondering if you guy's could help I'm here in the uk I start as a Trainee piping designer at the end of the…

I do not have that many years behind me to have the tag "experienced". However, a few things that came to my mind. You have been doing good things yo...

15 years ago
Forum
Reply
RE: all Pipers I am Designing a Modular Pipe Rack

SK, I had not come across this concept before this post. So thanks for the information posted. I just checked for this particular tag and following in...

15 years ago
Reply
RE: For piping software, do you have a wishlist of things you would like to be able to do with your software?

Almost all the softwares handle 3D with much ease even they iso' pipes quickly but then generating piping plans requires lot of stuff before they beco...

15 years ago
Reply
RE: New to this forum and this seemed like the best choice to ask my question related to P&ID's. What is the normal…

This will also depend on the environment (kind of programme) being utilized. For e.g. if you are in SmartPlant Environment where SPPID and SP3D are co...

15 years ago
Reply
RE: guys, Could anyone tell me the Standards and Codes applied for piping system on oil rig, platform,FPSO,etc?

I've never done offshore piping but 31.1 is Power Piping code so it should not be applicable.

15 years ago
Reply
RE: In horizontal vessel , how to decide which saddle will be fixed one

Few things that I'd like to add: 1. The nozzles which are connected to other equipments will benefit if you place them closer to the fixed saddle so t...

15 years ago
Page 2 / 9