30 / 60 / 90% Model Review Checklists
Indicative 30%, 60% and 90% piping model review checklists. Pick a stage, mark each row OK, ACTION, N/A or HOLD, add comments and initials, and download a PDF for the review record.
Each stage is tied to an indicative Level of Development: about LOD 200 at 30%, LOD 300 at 60% and LOD 350 at 90%. These are a starting point, not a standard. Your project’s BIM execution plan, model progression specification or contract governs what each review must cover.
The 90% review feeds straight into the Isometric Release Gate Checklist. For background, see Project stages, LOD and process piping and Lesson 1: What a Piping Designer Does.
30 / 60 / 90% Model Review Checklists
Indicative checklists for piping model reviews. Pick a stage, mark each row, and download a PDF for the review record.
Check this tool
Model Review Gates version 1.0.0
This records your check of the tool output. It does not change the tool or the engineering data.
Answers stay in your browser. Nothing is sent to a server. Software and AI-assisted checks can speed up a review; a competent person still reviews the model and signs off.
Your feedback
Does your company review models differently, or is a check missing at one of the stages? Tell us in the comments below and we’ll refine the lists.

Leave a Reply