Management & Supervision Tools – Downloads
Title | Description | Format |
| Typical Project Sequence (Engineering Disciplines) | This simple excel spread sheet is intended to show the relative relationship of some of the major activities of all the eight engineering disciplines from project kick-off to job close-out. | .xls |
| Typical Project Sequence (Piping) | This simple excel spread sheet is intended to show the interface relationship of the major activities for the four piping engineering & design groups from project kick-off to job close-out. | .xls |
| Piping Scope of Work | This MSWord based Tool was developed to give direction and guidance to the Lead/Supervisor in the development of the basis for the definition of the project. The Scope of Work is the foundation for everything that follows here and on the project. | .doc |
| Piping Labor Hour Example | This excel WorkBook was developed to give the Piping Lead/Supervisor the Tools to rapidly and accurately prepare a Labor Hour Estimate for all of the five sub-groups making up the total Piping effort on a project of any size. | .xls |
| Piping Labor Hour Estimate Blank Forms | Blank excel forms for Piping Labor hour estimate (above). | .xls |
| Piping Control Level Schedule Example | This excel WorkBook was developed to give the Piping Lead/Supervisor the Tools to rapidly and accurately prepare a Piping Control Level Schedule (CLS) for all of the five sub-groups making up the total Piping effort on a project of any size. | .xls |
| Piping Control Level Schedule Blank Form | Blank excel forms for Control Level Schedule (above) | .xls |
| Piping Physical Percent Complete Status | This excel spreadsheet Tool was developed to be used by the Piping Lead/Supervisor on projects to rapidly indicate the Physical Percent Complete & Productivity status of the major activities that make up the total piping effort on a project. | |
| Design Change Notice | This excel spreadsheet Tool was developed to be used by the Piping Lead/Supervisor on projects to log and track the description, hours and status of changes on a project after the labor hour budget has been approved. | |
| Piping Historical Data Log | This excel spreadsheet was developed to give a Piping Lead/Supervisor a quick and simple Tool to record key data factors that will influence Labor Hour Estimating for future projects. | .xls |
| Piping Line List | This excel spreadsheet form was developed to aid pipers with the concept and needs of a Line List. This form can be modified to add or delete data fields. Note: this document is sometimes called “Line Designation Table” | .xls |