PipingDesigners Community

A place for piping designers, engineers and industry professionals to ask questions, share experience, discuss technical topics and connect with other professionals.

Browse the discussions below or start a new topic. Please keep discussions practical, professional and relevant to the piping and engineering community.

Pipers i have a que...
 
Notifications
Clear all

Pipers i have a question ........we calculate pipe thickness based on Design Pressure say P. But during the…

6 Posts
5 Users
0 Reactions
80 Views
(@skgarg)
Estimable Member
Joined: 17 years ago
Posts: 91
Topic starter   [#309]

Hi Pipers
i have a question ........we calculate pipe thickness based on Design Pressure say P.
But during the hydro-test we keep the pressure 1.5P as per ASME code.
then why didn't pipe fails during Hydro-test?
Regards
SG



   
Quote
(@jop)
Noble Member
Joined: 20 years ago
Posts: 1164
 

a, The "pipe" itself is not the weakest link in the overall system. Now you are going to ask what is the weakest link? Do you have any flanged joints in your system? And do these joints have gaskets? Which is weaker a piece of pipe or a gasket? What about valves, do you have any valves? And do these valves have Stem Packing? What is stronger, a piece of pipe or the stem packing on a valve?

b, The Design Pressure has a safety factor on it that is higher than the 1.5P for the hydro-test. Go and talk to your Piping Material Engineer or whoever is the person who is responsible for the development of the Piping Material Line Class Specifications.



   
ReplyQuote
(@sidjain)
Estimable Member
Joined: 18 years ago
Posts: 59
 

Sk,
You can see the following topic.
http://pipingdesigners.com/wp//phpBB3/viewtopic.php?f=1&t=2370

2ndmoment given a good answer but still I am searching for a better answer. Hope I will find it soon and will post it.

Thank You
Siddharth Jain



   
ReplyQuote
(@shrivallabha)
Estimable Member
Joined: 17 years ago
Posts: 134
 

I've become fan of sorts of 2nd Moment. I find his posts are very insightful and well thought out. Thought of throwing in my 2 cents.

1. The procedure for thickness calculation (internal pressure) has formula as per ASME B 31.3 is:
t = PD
_____________
2(SE + PY)
The thickness found out by above formula is the minimum thickness required as per the pressure P.

2. The minimum required thickness is then:
tm = t + c
including mechanical, erosion and corrosion allowances.

3. This thickness is then rounded to the closest (on higher side) thickness available in the schedule table. If you back-calculate with this thickness, you are ably dealing with a pressure higher than the initial pressure calculated.

Regards,



   
ReplyQuote
(@abhijitn)
Reputable Member
Joined: 16 years ago
Posts: 191
 

1. The procedure for thickness calculation (internal pressure) has formula as per ASME B 31.3 is:
t = PD
_____________
2(SE + PY)
The thickness found out by above formula is the minimum thickness required as per the pressure P.

2. The minimum required thickness is then:
tm = t + c
including mechanical, erosion and corrosion allowances.

3. This thickness is then rounded to the closest (on higher side) thickness available in the schedule table. If you back-calculate with this thickness, you are ably dealing with a pressure higher than the initial pressure calculated.

After this step......as per me we need to add Mill tolerance that is
12% of calculated value of tm
that means

t=tm + 12% Mill tolerance (of tm)



   
ReplyQuote
(@shrivallabha)
Estimable Member
Joined: 17 years ago
Posts: 134
 

I was little confused until I read the last part of the post.

Yes, you are right.

As per ASME B31.3,
You'll need to check if Minimum thickness of pipe selected, considering Manufacturer's Minus Tolerance (and NOT constant 12.5%) shall not be less than tm.



   
ReplyQuote