Good Day Gentlemen,...
 
Notifications
Clear all

Good Day Gentlemen, During my 20 years experience of piping design, I have been taught ( by Lummus) that a piping…

5 Posts
4 Users
0 Reactions
105 Views
(@anton)
Member Moderator
Joined: 21 years ago
Posts: 674
Topic starter   [#339]

I received the following question by email, and wanted to put it to the forum for input.

-------------------------------

Good Day Gentlemen,
During my 20 years experience of piping design, I have been taught ( by Lummus) that a piping cross should never be used in refinery piping.
My Question is simple.
Is that still true today?
My Instrument department want to use a 2" cross on a 2 " stand pipe, firstly to reduce the amount of nozzles on the vessel and secondly to have all the gauges on the same level.
I have refused their request, but I do not have a valid reason
Your Valued input would be appreciated.

Best Regard
Xxxxx Xxxxx



   
Quote
(@anton)
Member Moderator
Joined: 21 years ago
Posts: 674
Topic starter  

My first thought is:

Is it in the spec?
If yes, then use it.

If not, then is there a valid reason to go out of spec?
If there is a compelling reason to go out of spec, it would need to be cleared with the materials engineer.
If there isn't a compelling reason to go out of spec, then look at other options.



   
ReplyQuote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

Below are my comments:
"I have been taught (by Lummus) that a piping cross should never be used in refinery piping."
Based on the information given we do not know why (someone at) "Lummus" said not to do this. Back in my work days I did it in Refinery Units (Crude Units and Vacuum/Asphalt Units) around the big Heaters that had "De-Coking" lines that would require cleaning. This was done at changes of direction (instead of elbows) with Blinded Weld-Neck Flanges on the other outlets. The Blind Flanges would be removed and the Coke was cleaned out by high pressure water jet lances.

"Is that still true today?"
If it were still true then fitting manufacturers would not make Crosses.

[color=#0000FF]"My Instrument department want to use a 2" cross on a 2 " stand pipe, firstly to reduce the amount of nozzles on the vessel and secondly to have all the gauges on the same level."
[/color]
The original poster did not give critical information with which to base a valid opinion. Information such as Commodity, Line Material, Operating Pressure, Operating Temperature is always helpful.

"I have refused their request, but I do not have a valid reason."
As a general answer I would not have a problem doing what the Instrument Engineer has requested. My other option would be to make the "Stilling well" part of the Bridle out of 4" pipe and attach 2" "O-Let" fittings for the connections of the instruments. Considering the probable cost of the Crosses the cost of the 4" Stilling Well method would be about the same or less.



   
ReplyQuote
(@shrivallabha)
Estimable Member
Joined: 17 years ago
Posts: 134
 

Are the SRUs (Sulphur Recovery Units) considered as a part of refineries? These days due to emission norms a lot of SRUs are coming up. If they are considered as a part of main refinery then it will be another instance of using Cross. Sulphur (kept in molten state) lines always have a risk of solidification so crosses are provided mostly at direction change to facilitate clean up.



   
ReplyQuote
 hc
(@hc)
Estimable Member
Joined: 20 years ago
Posts: 96
 

I did something similar recently where they wanted to have a level gauge and a transmitter off the same nozzle location on a tower. So I gave them as your suggesting a bridle with olets on opposite sides rather than a cross. I'm not much into understanding actual costs but, I'm guessing the cost of materials plus welding is pretty close either way when all is said and done. You gotta think too, your standpipe will be larger probably than you instrument connections. Also....I'm not sure but, a cross probably isn't a heavily stocked item is it? So it may be expensive.



   
ReplyQuote