JOP.... I m new to this tremendous group. I have a doubt ?

3 Posts
2 Users
0 Reactions
70 Views
(@thestranger)
Active Member
Joined: 18 years ago
Posts: 2
Topic starter   [#176]

Hi..JOP....

I m new to this tremendous group. I have a doubt ?

In our project we are dealing with EDP(Emergency Depressurization) lines on the suction and discharge lines to
sent out the blocked volume of gas when there is a shutdow. Explain this in detail.

Why i am asking this is , a start-up pressure is req. after the EDP action,when we start the compressor again.These are the things i heard. As i m in the junior level i cant get this from my side.

Explain me about this?



   
Quote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

thestrangert,
You wrote:

I m new to this tremendous group. I have a doubt ? I think you have a question There is a difference between a doubt and a question.

In our project we are dealing with EDP(Emergency Depressurization) lines on the (Compressor) suction and discharge lines to send out the blocked volume of gas when there is a shutdown. Explain this in detail.

Why I am asking this is , a start-up pressure is required after the EDP action, when we start the compressor again. These are the things I heard. As I,m in the junior level and I can't get this from anyone on my side.

Strainger,
I could not possibly answer this question with only the information you have provided. I would need to be there with you, look at the P&ID and talk to the Process Engineer and the Compressor Engineer. Anything else and I could lead you to wrong information.
Sorry!

Let's hope someone sees this and has better background.



   
ReplyQuote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

thestrangert,
You wrote:

I m new to this tremendous group. I have a doubt ? I think you have a question There is a difference between a doubt and a question.

In our project we are dealing with EDP(Emergency Depressurization) lines on the (Compressor) suction and discharge lines to send out the blocked volume of gas when there is a shutdown. Explain this in detail.

Why I am asking this is , a start-up pressure is required after the EDP action, when we start the compressor again. These are the things I heard. As I,m in the junior level and I can't get this from anyone on my side.

Strainger,
I could not possibly answer this question with only the information you have provided. I would need to be there with you, look at the P&ID and talk to the Process Engineer and the Compressor Engineer. Anything else and I could lead you to wrong information.
Sorry!

Let's hope someone sees this and has better background.



   
ReplyQuote
Share: