Sir, I consider myself novice piper, and I get questions every now an then

6 Posts
2 Users
0 Reactions
102 Views
(@Legacy guest)
Joined: 1 second ago
Posts: 0
  [#303]

Hello Sir,
I consider myself novice piper, and I get questions every now an then.
Currently I started working on a project for loading and unloading of petroleum products (black and white oil) from ships via MLA berths to a manifold.
So can you you please elaborate on the process and use of the stripping lines from the headers in the manifold.

thanks,
IMRAN



   
Quote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

Sorry I have not ever heard these terms before.

Please define - "MLA" What does it stand for?

Please give some more information on the "stripping lines":
From a P&ID standpoint:
- How many "stripping lines" are there?
- Where do they attach to the Manifold?
- What kind of valving do they include?
- Where do they end?



   
ReplyQuote
(@Legacy guest)
Joined: 1 second ago
Posts: 0
 

Sir,
Basically the task I have been given involves stress analysis of the stripping lines, so I shall brief you on the basis of analysis.
The system data input starts from stripping suction lines with off-take from 90 degrees bends, downstream of main dock line launchers in matrix manifold.
Displacements of these 90 degree bends have been applied to all the individual suction lines. These individual lines are connected to common suction header leading to pumps P-5001A/B.
One horizontal expansion loop has been added to bring the system stresses and anchor forces within limits. The pump suction side nozzles have been considered as anchor points whose loads are compared with the allowable pump loads.
Similarly, the discharge side piping of pumps P-5001 A/B have also been modeled. Individual discharge line connections, upstream of the dock line launchers have been considered as anchor points. The pump discharge side nozzles are also considered as anchor points whose loads are compared with allowable pump loads.
- MLA- Marine Loading Arms.

Hope you can extract the required information out of it. I shall be very much thankful to you educate me on this.
regards
IMRAN.



   
ReplyQuote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

In your original post question you wrote"
"So can you you please elaborate on the process and use of the stripping lines from the headers in the manifold?"

What is a stripping line?

Other than some pumps, you have still not told us the purpose of or a verbal description, P&ID or picture of a "Stripping Line"



   
ReplyQuote
(@Legacy guest)
Joined: 1 second ago
Posts: 0
 

The term stripping lines is also new to me but still as far as i have understood about them i shall let u know.
In our project which consists of large diameter above ground headers(30", 28", 26" & 16"), basically used to transfer oil between the ship terminal to storage tanks. The stripping lines are used to collect the residual oil from the headers after the transfer of oil. Pumps are also installed for this purpose .
On a rough basis i can tell you that these lines are used to suck the residual oil via pumps and discharge it to storage areas.
So, i'm involved in the stress analysis of these stripping lines, so can u plese let me know what load cases are to be considered and where the anchor points must be considered and any other relevant information regarding the analysis

Thanx,
IMRAN.



   
ReplyQuote
(@jop)
Noble Member
Joined: 21 years ago
Posts: 1164
 

Okay, now I understand a little more what you have there.
You gave us the sizes of the main headers but you did not give us the sizes of the "stripping" lines.

From what you did give us, I would have called these lines "Slops" lines. Same purpose.
These stripping (slops) lines would be NPS 3" (DN 80" or NPS 4" (DN 100). They would have been routed to a small pump for the purpose of draining and transferring the slops to a Slops tank. These lines, the main headers and the slops lines are not normally hot so there is not a great deal of thermal expansion therefore stress.

Each slops line should have a block valve minimum distance from the main header. The individual slops branches should attach to the main at a low point and very near to the anchor of the Mains.
The slops branch should be collected as soon as possible into one line that goes to the slops pump.

You did not say where this project is located. If it is in a very hot desert location then the slops line could adsorb a lot of solar radiation during the day. So some flexibility needs to be built in because the slops line will be inactive for long periods of time. I suggest a routing that is "Z" shaped from the mains to the pump.

These are just some suggestions based on what I think you have and need to accomplish. Lets hope some others join in with more suggestions also.



   