Reply
RE: Pipers, I just like to know if there is an international standard in allocating man-hours for piping design…

Dear JOP, I am totally with your point. However request you to provide us some detailed structured view of the estimation philosophy followed in curr...

15 years ago
Reply
RE: All Which valve comes first, Globe valve or Ball Valve In Control Valve Bypass line, Normally i used to locate Globe…

I agree with JOP. We need to check up with the process Engineer to get a valid reason. However I want to pin down one thing here. There were assumptio...

16 years ago
Forum
Reply
RE: members, Could anyone advice me as to what a composite arrangement or composite isometric aims to deliver?

We are generally doing composite layout but not the com[psite isometric. Composite layout is generally an undergroung layout which is normally a deliv...

16 years ago
Reply
RE: I have a question regarding the wall thickness calculation and the hydrotest calculation

Dear Jain, When the pipe wall thickness is calcuated the stresses taken for calculation is 90% of the yield stresses. Therefore the hydrotest pressur...

16 years ago
Reply
RE: In a Control Station Assembly/ Control Valve Manifolds we try to put the by-pass valve as near to upstream side as…

The reason for putting the bypass valve in the upstream is to avoid the ded leg in the line but that depends upon the configuration of the control val...

17 years ago