CAN ANYONE TELL ME WHAT IS THE NATURE OF WORK OF A PIPING LAYOUT ENGINEER AND PIPING STRESS ANALYSIS ENGINEER? WHAT THEY DO , DO THEY GO TO SITE OR S...
-Most commonly, we will have these kind of mark ups for example-Combining utility lines, PSV outlet lines, addition or deletion of reducers....what ar...
Engineering Philosophy:- In many cases, the Licensor and the Client have vast experience of handling plants which gives them good insight. The enginee...
Prior to piping design, I had worked in a Pharmaceutical company. A lot of glass lined CSTRs (Continuous Stirred Tank Reactors) were used for low pH r...
I tried to search as well but it all seemed to be going nowhere. Here is some explanation (and not all). We'll try to understand in step by step manne...
[quote]ashokaa, You say that the P&ID shows two valves in the CV bypass. Ok, which valve is shown first (in flow direction)? Now since the Process...
I am just trying to guess the possibility here... Leakage is a possibility and if it is the case then: 1. Valve leaking the least should come first so...
Jop, Thanks for good answers! But I have a query generated from your answer. My qestions is from your FAQ#1. I know there are some services or materia...
Flat Face (FF) flange will have more surface than Raised Face (RF) flange. So is it different (& rare) terminology used? OR Is Male / Female is cl...
With all respect, I still am not in full agreement with Jop's post. The process engineer based on design data decides whether insulation is necessary...
The insulation type and thickness are scope of Process Engineer. Please check with the process department.
I have (vague) recollection of the caption: Instance 1: The composite drawing term was used for a drawing which comprised: a. Civil underground b. Pi...