1. Why dimensions are in millimeters and elevations in meters (generally)?
Accepted convention is OK but there would be some precedent to it.
2. Underground minimum connection size is 2" in most of the cases. What is the reason?
Kindly correct me if this is not the thumb rule.
3. Slope is 1:500 unless otherwise stated for sloped lines. Where does it have its origins?
Regards,
1. Why dimensions are in millimeters and elevations in meters (generally)?
Accepted convention is OK but there would be some precedent to it.
I would normally annotate all dimensions as millimeters, including elevations .... although the meter is the SI base unit of length, it is not very convenient for detailed drawing applications.
Annotating all dims in mm gives consistency across the drawing(s)
This should be set out in the drawing procedures for the project / office.
2. Underground minimum connection size is 2" in most of the cases. What is the reason?
Kindly correct me if this is not the thumb rule.
Underground minimum connection to what?
3. Slope is 1]
1:500 is a very gradual slope.
This would normally mean that the line needs to be free draining with no pockets.
Underground minimum connection to what?
Sorry for goofing it up...Closed Blow Down System / Amine Blow down System (CBD/ABD). The connection at AG/UG interface is 2" (of course, flanged) mostly.
Regards,
1. Why dimensions are in millimeters and elevations in meters (generally)?
Accepted convention is OK but there would be some precedent to it.
All dims should be in millimeters. I have never seen elevations done in meters. That would really confuse someone. You need to be consistant.
2. Underground minimum connection size is 2" in most of the cases. What is the reason?
Kindly correct me if this is not the thumb rule.
Thats a rule of thumb I follow. I believe its a strength issue. Another thing I think you mentioned is flanges. I've seen tons of buried flanges when I worked in the states although here in Canada its an absolute NO NO. Flanges leak and you don't put them underground.
3. Slope is 1:500 unless otherwise stated for sloped lines. Where does it have its origins?
Thats a very gradual slope and is a min. If you have shorter runs of pipe 1:500 is nothing.
On sloped lines it depends on what the service and duty is. If it is a pipeline it could have a 6% slope, if a flare header 1:200 is sufficient, if it is an OWS a different slope according to velocity etc.
A good rule of thumb is alway 1/8"/1ft for piping to self drain depending on the commodity. If it is thick and viscous then the slope will increase.
Thank you all for your kind inputs.
The flange connections I am referring to are for at Above Ground / Under Ground interface. The case is Closed Blow Down system. So for a CBD system (In Canada) how do they approach AG/UG interface connection? Just curious!